Laserfiche WebLink
f <br /> Remediation Activities—First Quarter 2003 <br /> In August and September 1999, SECOR installed a vapor extraction/air sparging system at the subject site to <br /> remediate hydrocarbon-Impacted soils and groundwater The vapor extraction system consists of ten wells <br /> (W-1 through W-8, MW-1 and MW-3) manifolded within the remediation compound Vapors are extracted <br /> with a blower and destroyed with a catalytic oxidizer with a destruction efficiency of at least 95% The air <br /> sparging system consists of 4 wells (AS-1 through AS-1) An air compressor is used to introduce air into the <br /> sparging wells, and recovered vapors are destroyed with the SVE system System operation began <br /> December 13, 1999 <br /> Based on the analysis of influent samples, SECOR estimates that 55 5 pounds of gasoline-range <br /> hydrocarbons were removed and treated during the reporting period at an average extraction rate of 48 scfm <br /> SECOR estimates that 38,841 pounds of hydrocarbons have been removed since system startup Although it <br /> was not present during First Quarter 2003, approximately 62 gallons of free product have been bailed from <br /> MW-1 since Its detection In February 2000 Tables A-1 and A-2 In SECOR's report include soil vapor <br /> analytical results and system efficiency results <br /> If you have any questions regarding these matters, please do not hesitate to contact me at(206)286-4495 <br /> Sincerely, <br /> Time Oil Co c y J/ <br /> I J�1G+��I Cti41 l� �l w 9�t r MkwlM <br /> Anastasia E Duarte-Wilkinson <br /> Environmental Toxicologist <br /> cc Ms Elizabeth Thayer <br /> California Regional Water Quality Control Board <br /> letterslcalrfl404914049159 doc <br /> 2 <br />