Project Description— Report of Composting Site Information <br /> Tracy Material Recovery Facility and Transfer Station <br /> 30703 S. MacArthur Drive, Trary, Califomia 95377 <br /> r- <br /> • Equipment breakdowns <br /> In the event of equipment breakdowns that prevent routine daily activities for CTI <br /> System"" composting preparation, bagging, aeration, or removal of finished <br /> material, the following contingency plans will be in-place. <br /> • Loader equipment <br /> In the event of a loader breakdown, and if necessary to keep up with the <br /> inflow of feedstock at that time, an additional loader may be rented from a <br /> local equipment rental facility. <br /> • Grinding equipment <br /> If the onsite grinding equipment becomes inoperable, the following <br /> procedures will be followed: <br /> • Day 1 & 2: <br /> Feedstock materials will be stockpiled in designated locations. Green <br /> material feedstock materials will be stored in the "CTI Feedstock <br /> Processing/Mixing Area" shown on Drawing or used as feedstock for <br /> conventional open windrow composting. An estimated 5,000 cubic <br /> yards of feedstock material can be stored in the "CTI Feedstock <br /> Processing/Mixing Area". Rolling feedstock, defined as incoming <br /> feedstock that has to be moved and processed, or"rolled" from the <br /> processing area to windrow or CTI bags, shall not be stored for more <br /> than 48 hours within the CTI Feedstock Mixing Area. <br /> • Day 3: <br /> Should repairs to the grinding equipment be anticipated beyond the <br /> second day, the operator will redirect all incoming food waste loads to <br /> an appropriate alternate disposal site on the third day and schedule an <br /> alternate grinder to be mobilized on Day 2 for use at the beginning of <br /> Day 3. Once stockpiled food waste feedstock has been processed and <br /> the stockpile has returned to a normal daily level, acceptance of food <br /> waste loads may resume at the facility. <br /> • Water truck equipment <br /> Breakdowns of one of at least two water trucks being required onsite is not <br /> anticipated presenting a problem. Should a problem arise, an additional <br /> water truck may be rented from an equipment rental facility. <br /> • Bagging equipment <br /> One bagging machine is required to process the proposed peak throughput of <br /> 68 tons per day. In the event of breakdowns to one or more of the bagging <br /> machines, a timeline and procedure similar to the grinding equipment <br /> breakdown contingency plan will be enacted, <br /> Edgar&Associates,Inc. 43 <br /> Tracy Compost Fac ProjDesc042310 <br />