Laserfiche WebLink
Tae W. Oh <br /> January 26, 2001 <br /> Page 2 <br /> WILL SERVE REQUEST -- APN 159-100-04 (5113 AND 5143 MAIN STREET) <br /> Option 2 <br /> Option 2 includes the construction of a new sewer line in Main Street, parallel to <br /> the existing line, from Walker Lane to Oro., This line would not connect to <br /> System #4, but would convey flows from this development directly to the point of <br /> connection into System #6. This option will not require approval by the County <br /> but would require you to provide engineered plans for the new sewer line to be <br /> approved by both the City and the County. This line has not yet been sized. <br /> City sewer service is subject to the payment of all applicable fees and charges, in <br /> accordance with City of Stockton rules and regulations and any limitations <br /> governing such service which may be in effect at the time that building permits <br /> are issued. <br /> Also, please be advised that this letter is not to be construed as a reservation of <br /> current or future capacity. As mentioned above, sewer system capacity is <br /> available on a first come - first serve basis and capacity is allocated when <br /> building permits are issued. <br /> MORRIS L. ALLEN <br /> DIRECTOR OF MUNICIPAL UTILITIES <br /> MLA:MJM:mm <br /> Cc: Manuel Lopez, Public Works Director, San Joaquin County <br /> ::ODMAIGRPW ISEICOS.MUD.MUD_USRARV:11163.1 <br />