My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0002156
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
5113
>
2600 - Land Use Program
>
UP-01-03
>
SU0002156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:29:03 AM
Creation date
9/6/2019 10:01:19 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0002156
PE
2626
FACILITY_NAME
UP-01-03
STREET_NUMBER
5113
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
ENTERED_DATE
10/23/2001 12:00:00 AM
SITE_LOCATION
5113 E MAIN ST
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\M\MAIN\5113\UP-01-03\SU0002156\APPL.PDF \MIGRATIONS\M\MAIN\5113\UP-01-03\SU0002156\CDD OK.PDF \MIGRATIONS\M\MAIN\5113\UP-01-03\SU0002156\EH COND.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Tae W. Oh <br /> January 26, 2001 <br /> Page 2 <br /> WILL SERVE REQUEST -- APN 159-100-04 (5113 AND 5143 MAIN STREET) <br /> Option 2 <br /> Option 2 includes the construction of a new sewer line in Main Street, parallel to <br /> the existing line, from Walker Lane to Oro., This line would not connect to <br /> System #4, but would convey flows from this development directly to the point of <br /> connection into System #6. This option will not require approval by the County <br /> but would require you to provide engineered plans for the new sewer line to be <br /> approved by both the City and the County. This line has not yet been sized. <br /> City sewer service is subject to the payment of all applicable fees and charges, in <br /> accordance with City of Stockton rules and regulations and any limitations <br /> governing such service which may be in effect at the time that building permits <br /> are issued. <br /> Also, please be advised that this letter is not to be construed as a reservation of <br /> current or future capacity. As mentioned above, sewer system capacity is <br /> available on a first come - first serve basis and capacity is allocated when <br /> building permits are issued. <br /> MORRIS L. ALLEN <br /> DIRECTOR OF MUNICIPAL UTILITIES <br /> MLA:MJM:mm <br /> Cc: Manuel Lopez, Public Works Director, San Joaquin County <br /> ::ODMAIGRPW ISEICOS.MUD.MUD_USRARV:11163.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.