Laserfiche WebLink
(4) Intersection of Roth Road @ South Harlan Road: 14 272.00 <br /> Total: $1,148,522.00 <br /> j. Prior to issuance of the Certificate of Occupancy, if access to this site is designated as an STAR <br /> route, providv.="Terminal Access Route" signage as required by Caltrans. <br /> k. Prior to issuance of any building permits, the applicant shall pay the Traffic Impact Mitigation Fee. <br /> The fee will be' based on the current schedule at the time of payment. The fee shall be automatically <br /> adjusted July1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering dews Record. (Resolution R-00433) <br /> I. Prior to issua0ce of any building permits, the applicant shall pay the Regional Transportation Impact <br /> Fee. The fee'.will be based on the current schedule at the time of payment. (Resolution R-06-38) <br /> m. A copy of thoinal Site Plan shall be submitted prior to the release of building permits. The Final <br /> Site Plan shall include the following: <br /> (1) Designated on-site pedestrian walkways and striped crosswalks to enhance the pedestrian's <br /> visibility to on-site motor vehicles. <br /> (2) On-site signage and pavement striping shall be provided to convey one-way driveway operations <br /> to all approaching vehicles. <br /> �Ac <br /> (3) On-site".ruck Entrance"signage. <br /> (4) On-Site"bo Not Enter' signage. <br /> �a. <br /> (5) On-site",Exit Only"signage, <br /> n. Prior to issuance of any building permits, the applicant shall obtain verification from,the Solid Waste <br /> Division (468 3066)that this development has met the requirements of the Waste Plan Format for <br /> DevelopmentProjects. The Final Site Plan is required upon submittal of verification. <br /> 4s <br /> o. An encroachment permit shall be required for any proposed underground utilities across Manthey <br /> Road. Y. <br /> p. Storm drainage runoff created by this development shall be retained on the site and be designed <br /> according to'$an Joaquin County Improvement Standards Chapter 3, "Storm Drainage Design <br /> Standards," Sections 3.46 and 3.58. (Development Title Section 9-1135.9) <br /> q. The California Stormwater Quality Association Best Management Practices Guidelines for Retail <br /> Gasoline Outlets shall be used on this project. <br /> r. The Californip.Stormwater Quality Association Best Management Practices for Auto Repair Shops <br /> shall be incorporated into the site's storm drainage design. <br /> s. Storm drainage runoff from the parking areas must be drained through a sand/oil separator prior to <br /> discharging into the storm water retention/detention system. <br /> San Joaquin County- PA-0800.1021Kelly <br /> Community Development Page 13 <br /> h-' <br />