Laserfiche WebLink
Fslipngle <br /> AND OPERATIONAL SPECIFICATIONS <br /> Filter Beds: The second compartment of septic tank will be the pump, or dosing chamber <br /> Cd. One Orenco BioTubeg Filter Pump Vault PN: PVU572425L with Duplex Effluent <br /> : P500512, '/2 HP,50 gpm,230 Volt contained with BioTube Pump Vault. One <br /> Flowmeter(PN FM150)to be installed on the transport line. <br /> Laterals for Each Filter Bed: Sch.40 PVC 1.5" nominal diameter, 5/32" orifice directed at 12 o'clock with <br /> orifice shields,4.0 ft spacing, 88 ft long. As with the Office Building Filter Bed, 1.5 ft of drain rock must <br /> extend beyond each end of the 88 ft lateral to give a final filter bed N-S length of 91 ft(88+1.5+1.5 =91 ft). <br /> "Tum-ups"are to be at the ends of each lateral for clean-out, and contained within valve cover boxes. <br /> Orifice Discharge Rate: 5/32" with 5 ft residual head=0.68 gpm <br /> 88 ft-4.0 ft=22 orifices/lateral x 0.68 gpm/orifice= 15 gpm/lateral <br /> An anti-siphon assembly(Model HVAS125)must be used if for an unforeseen reason there must be <br /> pumping downhill. <br /> Network Discharee Rate(NDR)For Each Filter Bed=2 laterals x 15 gpm/lateral=30 gpm <br /> Manifold for Each Filter Bed= 1.5" Sch. 40 PVC, 3.3 ft length <br /> Estimated Total Dose Volume(TDV)From Each Puma: <br /> 0.092 gals/ft x 88 ft x 2 laterals= 16.2 gals x 5 times lateral void volume=81 gals <br /> 1.5" x 3.3 ft manifold=0.092 gals/ft x 3.3 ft=0.3 gals <br /> Transport line= 1.5"=0.092 gals/ft x -108 ft= 10 gals <br /> 84+ 1 + 10=95 gaWdose+30 gpm=3.2 min/dose <br /> 150 gpd ADF-=95 gals/dose= 1.6 doses/24 hr period/each pump alternating to single disposal field. <br /> Monitoring of Each Filter Bed: Monitoring of effluent with four monitoring ports or wells within the filter <br /> bed area. Two monitoring ports are to be observation tubes,with the other two monitoring ports to be soil <br /> sampling ports. Observation tubes: 4" PVC Tee at soil/effluent interface with 4" riser extending above the <br /> soil/grass surface, with a screw type cap. Tubes must be placed in low areas to check for pooling. <br /> Soil sampling tubes: 4" PVC pipe extending to soil/effluent interface with 4" riser extending above the grass <br /> surface by at least 0.5 foot,with a screw type cap. Both soil sampling tubes must be placed in proximity to <br /> a lateral orifice. <br /> IV. CONCLUSIONS AND RECOMMENDATIONS <br /> SSS§ 5.4 The soils underlying the proposed filter bed disposal area for the East Leach Field <br /> (ELF)to serve the new Office Building and the soils under the West Leach Field (WLF) disposal <br /> area to serve the Office Trailers show excellent permeability. Permeability was measured as <br /> percolation rates in the soil profiles from two feet in depth,which is the approximate soil-effluent <br /> interface, down to five feet(60 inches) in depth. <br /> 20 <br /> Chesney Consulting <br />