Laserfiche WebLink
Soil Suitability Study***MS-01-24*** APN: 059-210-37***2 Parcels,Parcel A-5.03 Acres and <br /> Parcel 13=5.00 Acres***Total=10.03 Acres <br /> Depth % Clay Permeability <br /> In Inches (Inches/Hour) <br /> 0-22 40-60 0.6-0.2 <br /> 22-34 35 -60 0.6-0.2 <br /> 34-37 -------- ---------- <br /> 37-46 20-30 0.2-0.6 <br /> 46-60 -------- ------__--- <br /> PERCOLATION TESTS: <br /> Percolation test holes were determined to be required on both Parcels A and B to <br /> create two (2) parcels out of the larger single parcel as a result of inquiries made to the <br /> San Joaquin County Public Health Service,Environmental Health Division, <br /> On Friday, August 24, 2001, with hand auguring equipment, I dug two (2) <br /> shallow 8" diameter percolation test holes,PB1 and PB2, 35" and 421/2" inches deep <br /> respectively, on Parcel B. On Saturday, August 25, 2001, with power equipment,the <br /> property owner excavated three shallow 12" diameter percolation test holes,PA,PB3 and <br /> PB4. Percolation Test Hole PA is situate on Parcel A and Percolation Test Holes PB3 and <br /> PB4 are situate in Parcel B. By visual observation percolation test holes PB 1, P2 and PB3 <br /> were abandoned from further testing beyond their excavation. Percolation Test Holes,PA <br /> and PB4 were fully tested based on both visual observation and preliminary two-hour <br /> percolation testing. All of these Percolation Test Holes are shown on the "Test Hole <br /> Locations Map". <br /> On Monday, August 27, 2001, the shallow percolation test holes on Parcels A and <br /> B,Percolation Test Holes PA and PB4,repecfully, were presoaked overnight and <br /> percolation readings were conducted on Tuesday,August 28, 2001. <br /> Percolation Test Holes PA and PB4 shown on the attached"Test Hole Locations <br /> Map"were tested over four-hour periods and the results of the four-hour percolation tests <br /> are tabulated below. Percolation Test Hole PA on Parcel A met the standards for leach <br /> field construction but Percolation Test Hole PB4 did not and thus necessitated further <br /> deep hole (25' max. depth)percolation testing. <br /> On Tuesday, September 4, 2001,Hillside Geotechnical Drilling drilled Deep <br /> Percolation Test Holes PB5,PB6, PB7 and PB8 at the locations shown on the attached <br /> "Test Hole Location Map". Deep Percolation Test Hole PB7 is used as the Soil Profile <br /> Test Hole(SPH). Deep Percolation Test Holes PB5, PB6,PB7 and PBS were drilled to <br /> depths of 11.27', 15.3', 23.0' and 13.2', respectively. Because of visual observation and a <br /> preliminary one(1)hour test fast percolation rate determination , only Deep Percolation <br /> Test Hole PB5 was formally tested further beyond initial drilling. The rest of the Deep <br /> Percolation Test Holes were not tested further beyond their initial drilling, except for the <br /> use of Percolation Test Hole PB7 being used as the Soil Profile Test Hole (SPH). <br /> On Tuesday, September 4, 2001,Deep Percolation Test Hole was presoaked over night <br /> and percolation readings were conducted on Wednesday, September 5, 2001. <br /> Earl Sellers, 10979 North Micke Grove Road,Lodi,California 95240, (209)478-5760,(209)610-5602 <br /> 5 <br />