Laserfiche WebLink
Item No. 2 <br /> PC: 4-1-93 <br /> UP-93-1 <br /> Page 8 <br /> e. State on revised plans or improvement plans the correct location of the existing sewage <br /> disposal system, the maximum number of employees the sewage disposal system is <br /> being designed for, and that the leach field area will be barricaded so it cannot be driven <br /> over, parked on, or used as a storage area. This leach field area must be used for the <br /> specific purpose only and cannot contain any underground utility lines. <br /> 4. BUILDING INSPECTION DIVISION: <br /> a. The following Uniform Building Code and San Joaquin County Ordinance requirements <br /> will be applicable and shall be incorporated in the construction plans before submittal to <br /> the Building Inspection Division: <br /> (1) The proposed use will change the occupancy from a residence, R-3 occupancy, <br /> to an assembly office,A3/6-2 occupancy (UBC Section 502). The structure must <br /> be brought into compliance with all current code provisions including structural, <br /> plumbing, mechanical, electrical, energy, and handicap requirements. <br /> (2) Provide restrooms conforming with all disabled access requirements. (CCR Title <br /> 24) <br /> (3) The proposed project is located within an expansive soil area where a <br /> conventional foundation may not be suitable. Therefore, an engineer is required <br /> to evaluate the foundation design. <br /> b. A grading plan shall be submitted by the owner, and it shall be approved and a grading <br /> permit issued by the Building Inspection Division prior to any excavation or filling of earth <br /> material: <br /> (1) The grading plan shall contain the information listed in the UBC, Appendix, <br /> Chapter 70, Section 7006(1). <br /> (2) The grading plan shall include complete drainage details and elevations of the <br /> adjacent parcels. Retaining wall details shall be submitted where applicable. <br /> (3) Grading in excess of 5,000 cubic yards shall comply with Section 7014 for <br /> 'Engineered Grading Requirements.' <br /> (4) All recommendations of the soils engineer shall be incorporated in the grading <br /> plans. <br /> (5) All compaction reports must be submitted prior to a foundation inspection. <br /> (6) All grading permits are subject to approval by the other departments. <br /> (7) All grading authorized by the permit shall be approved prior to issuance of any <br /> building permits or the beginning of any construction. <br />