Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-00-58 <br /> 4. The Traffic Impact Mitigation Fee will be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $174.59 per daily <br /> trip-end as warehouse generated in the Stockton area. The fee shall be automatically <br /> adjusted July 1 of each year by the Engineering Construction Cost Index as published by the <br /> Engineering News Record.) A credit may be allowed if it can be verified that the existing <br /> development on this site was in operation on or after April 23, 1990. <br /> (Resolution R-00-433:) <br /> 5. A copy of the Final Si'-e Plan shall be submitted prior to release of building permit. <br /> 6. Verification shall be obtained from the Solid Waste Division (468-3066) that this development <br /> has addressed the items on the attached Waste Plan Format for Development Projects. Final <br /> Site Plan is required upon submittal of verification. <br /> GK:BN:tee <br /> PS-0KOWUE <br /> E: Thomas M. Gau, Deputy Director/Development <br />