Laserfiche WebLink
r r r F r IF r r r r r r r r r IF r r r <br /> rn 0 <br /> 0 <br /> mCD College Park at Mountain House Specific Plan HI <br /> Mitigation Monitoring and Reporting Program <br /> ' Implementation&Verification <br /> fl Implementation <br /> Mitigation Measure Timing/Schedule Responsibility Action Date <br /> 7 Completed <br /> conducted to investigate all potential nesting <br /> = trees on the project site(e.g.,especially tree-tops <br /> c 15-59 feet above the ground in oak,willow, <br /> CD eucalyptus,cottonwood,or other deciduous <br /> Cn <br /> trees),whenever white-tailed kites are noted on- <br /> CD <br /> site or within the vicinity of the site during the <br /> � nesting season. A setback of 100 feet from white- <br /> tailed kite nesting areas shall be established and <br /> maintained during the nesting season for the <br /> period encompassing nest building and <br /> continuing until fledglings leave nests.This <br /> setback applies whenever construction or other <br /> ground-disturbing activities must begin during <br /> the nesting season in the presence of nests that <br /> are known to be occupied. Setbacks shall be <br /> marked by brightly colored temporary fencing. <br /> < Northern Harrier.If project construction begins <br /> during the nesting season(February 15—August <br /> 31),pre-construction surveys shall be conducted <br /> during the nesting season in suitable nesting <br /> habitat within 500 feet of areas of project <br /> o activity.The survey shall be conducted within <br /> '—� the 2 weeks before construction begins.A <br /> setback of 500 feet from northern harrier nesting <br /> areas shall be established and maintained during <br /> nthe nesting season for the period encompassing <br /> nest building and continuing until fledglings <br /> fD leave nests. This setback applies whenever <br /> construction or other ground-disturbing activities <br /> must begin during the nesting season in the <br /> presence of nests that are known to be occupied. <br /> 23 M Setbacks shall be marked by brightly colored <br /> 3 temporary fencing. <br /> < Common Raptors.If project construction begins <br />