Laserfiche WebLink
MOuNTAIN HousE PROPOSED MACHADo TENTATIvE MAP 4. ENVIRONMENTAL CnE=sr <br /> 4.6 GEOLOGY AND sons <br /> The MEIR indicated that the project site is located outside areas of southwest San Joaquin l <br /> County identified as susceptible to landsliding. Evidence of slope failures and/or landslides <br /> has not been mapped within or immediately adjacent to the project site. The potential for <br /> landslides at the project site is remote due to the gently sloping terrain. <br /> Mitigation Measures <br /> No mitigation measures are required. <br /> b) Result in substantial soil erosion or the loss of topsoil? <br /> Excessive soil erosion is not expected to occur during construction at the project site because <br /> average slopes are only one percent. Cut and fill quantities for the house pads and roadbeds <br /> are anticipated to be minimal due to the relatively level terrain. However, the project would <br /> require stripping of all vegetation,debris,topsoil, or any other unsuitable material. <br /> Project construction would have to comply with the National Pollutant Discharge Elimination <br /> System(NPDES)program requirements. The NPDES storm water program, administered by _ <br /> the State Water Resources Control Board's(SWRCB)Division of Water Quality,regulates <br /> construction sites that disturb five or more acres of land. Under the program, contractors are <br /> required to prepare and implement a Storm Water Pollution Prevention Plan that includes <br /> Best Management Practices (BMPs)to prevent soil erosion and off-site migration of <br /> sediment-laden runoff during construction. Additionally,MHMP Policy 6.8.3(b)and the <br /> County Development Title require that adequate efforts be implemented during construction <br /> to control or eliminate soil erosion and sedimentation associated with construction activities. - <br /> Once construction is completed and project topsoil has become stabilized, soil erosion at the <br /> project site would be greatly reduced. Additionally, all urban runoff from the project site <br /> would flow through the storm drain system to water quality basins within the Mountain <br /> House Creek corridor that would help to remove sediment from site runoff. Sedimentation, <br /> soil erosion,and water quality issues are finther addressed in Section 4.8: Hydrology and <br /> Water Quality of this Checklist. <br /> Project development would increase the amount of impervious surfaces at the project site and <br /> increase the quantity of runoff. In addition,runoff would flow into storm drains that would <br /> result in increased velocity of water leaving the project site. However,runoff from the <br /> project site would be conveyed to Water Quality Basin 1 located north of Byron Road on the <br /> east side of Mountain House Creek. This basin will substantially reduce flow velocities prior <br /> to discharge to Mountain House Creek. In addition,the Mountain House Master Drainage - <br /> Plan Update requires in locations where the velocity of the runoff can be expected to cause <br /> erosion that protection measures(e.g.,concrete,riprap, soil-reinforcement products)will be , <br /> used to prevent erosion(Pace,2002). With implementation of these existing requirements,a <br /> less-than-significant impact would occur. <br /> Mitigation Measures <br /> No additional mitigation measures are required. <br /> 4-30 <br />