Laserfiche WebLink
typical 14-foot wide median. [SP3 Implementation Measure 4.5.2.3 (d).] <br /> Timing: Improvement Plans approved by CDD and MHCSD. <br /> AGRICULTURAL RESOURCES <br /> 27. Agricultural Operation Phasing: An Agricultural Buffer and Conversion Phasing Plan shall <br /> be submitted to the Community Development Department and approved by the Director. The <br /> plan shall incorporate the following: <br /> a. Phasing of areas from agricultural to urban use— locations and time frames; <br /> b. Irrigation water supply and service plan approved by BBID; <br /> c. BBID encroachment permits; <br /> d. Temporary buffering that includes a 100-foot setback (or as adjusted by condition <br /> 10) between the edge of development and ongoing agricultural operations as the <br /> project builds out; <br /> e. Permanent setbacks; <br /> f. Landscape buffers; and <br /> g. Fencing, signage or other suitable measures to minimize noise, spray drift and <br /> limit the potential for trespass on agricultural lands and BBID facilities. <br /> In addition, the plan shall address the following: <br /> h. Chemical applications; and <br /> i. Dust management. <br /> Note: An exception to the requirements specified in (a), (d), (e), (f), (h), and (i) may <br /> be granted when the owner of such agricultural land has indicated in writing that the <br /> land will no longer be used for agricultural production. <br /> Timing: Condition shall be met prior to approval of the Final Map. [MP policies 3.2.4 g), h) <br /> and i)and Specific Plan III Implementation Measure 3.2.4.3. d and e] <br /> 28. Right To Farm Recordation And Notification: The deed of each parcel shall include the <br /> following recording notification, as specified by San Joaquin County Ordinance 4217 which <br /> added Section 6-9004 et. seq. to Chapter 1 of Division 9 of the San Joaquin County <br /> Ordinance Code regarding the Right to Farm Notice: "All persons purchasing lots within the <br /> boundaries of this approved map should be prepared to accept the inconveniences or <br /> discomforts associated with agricultural operations or activities, such as noise,odors, insects, <br /> dust or fumes. San Joaquin County has determined that such inconveniencies or discomforts <br /> shall not be considered to be a nuisance." [Implementation Measure 3.2.4.3.9 <br /> Timing: Prior to approval of Final Map(s). <br /> NOISE <br /> 29. Soundwalls: Construct noise walls pursuant to the"Fencing, Soundwall, and Pipe <br /> Relocation Plan"for 3557 Tentative Map, dated May 2, 2006, and as required by Mitigation <br /> Measure 4.13-4 and as indicated in Table 4.13-11 in the approved College Park at Mountain <br /> House Environmental Impact Report("FEIR"). <br /> Timing: Design submitted with Improvement Plans and soundwall constructed prior to <br /> occupancy of the first residence along De Anza Boulevard. <br /> 30. Locations and Heights of Soundwalls and Berms: The applicant shall construct a <br /> soundwall with or without berms at the location shown in Figurel l-1 of the College Park at <br /> Mountain House Specific Plan Ill("Specific Plan IIP') document and as required by Table <br /> 4.13-11 of the FEIR. The soundwall along De Anza Boulevard shall be 7 feet in height. <br /> 5 <br />