My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006110
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
22801
>
2600 - Land Use Program
>
PA-0500544
>
SU0006110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:43:47 PM
Creation date
9/6/2019 10:18:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006110
PE
2611
FACILITY_NAME
PA-0500544
STREET_NUMBER
22801
Direction
S
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
MOUNTAIN HOUSE
APN
20908025
ENTERED_DATE
7/5/2006 12:00:00 AM
SITE_LOCATION
22801 S MOUNTAIN HOUSE PKWY
RECEIVED_DATE
7/3/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\M\MOUNTAIN HOUSE PKWY\22801\PA-0500544\SU0006110\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
358
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.r V <br /> noise. The following shall be noted on the Final Map: <br /> "The deed of each lot shall contain a recording notification that Neighborhood AIB lies <br /> within Byron Airport's potential aircraft noise impact area, defined as Zone D of the <br /> Contra Costa Airport Land Use Compatibility Plan, Compatibility Map (Figure 4B)." <br /> Timing: Note on final map approved by CDD prior to Final Map approval and deed note prior <br /> to issuance of building permits. <br /> 35. Interior Noise Levels: Interior noise levels for housing proposed to be located in areas <br /> exposed to an exterior noise level of an Ldn above 60 dB shall be maintained at or below an <br /> Ldn of 45 dB. [Implementation Measure 11.2.1 (4)] <br /> Timing: Compliance verified prior to the issuance of building permits. <br /> 36. Construction Noise: The following measure shall be implemented during construction: <br /> • Construction shall be limited to the hours of 6:00 AM to 9:00 PM on weekdays. Extended <br /> hours which may include Saturdays and Sundays may be allowed through prior notice to <br /> adjacent residents and landowners, and prior approval of the MHCSD for infrastructure <br /> construction and CDD for building permits. <br /> • Comply with all San Joaquin County Development Title for all construction activities <br /> • Equip all construction vehicles or equipment, fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or shrouds, in accordance with the <br /> manufacturers' recommendations. <br /> • Arrange all construction equipment and truck routes to minimize travel adjacent to <br /> occupied residences. <br /> • Locate stationary construction equipment and staging areas as far as possible from <br /> sensitive receptors. Temporary acoustic barriers may be installed around stationary <br /> equipment, if necessary. [Mitigation Measure 4.13-1 from Specific Plan III EIR] <br /> Timing: Inclusion of the above measures as notes on Improvement Plans approved by CDD <br /> and MHCSD prior to Final Map approval. <br /> GEOLOGY AND SOILS <br /> 37. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD <br /> Emergency Preparedness Plan. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. <br /> 38. Geotechnical Investigation Recommendations: The applicant shall follow the <br /> recommendations of the Preliminary Geotechnical Services Report Mountain House <br /> Business Park Mountain House, California prepared by Kleinfelder, Inc., dated November 6, <br /> 2002. In addition, the following elements or mitigation equivalent shall be followed: [SPIII <br /> Implementation Measure 4.5.3 (e).]: <br /> a) All fill material used for engineered fill at the project site shall meet the specifications <br /> of the Geotechnical Reports. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.