Laserfiche WebLink
.r V <br /> noise. The following shall be noted on the Final Map: <br /> "The deed of each lot shall contain a recording notification that Neighborhood AIB lies <br /> within Byron Airport's potential aircraft noise impact area, defined as Zone D of the <br /> Contra Costa Airport Land Use Compatibility Plan, Compatibility Map (Figure 4B)." <br /> Timing: Note on final map approved by CDD prior to Final Map approval and deed note prior <br /> to issuance of building permits. <br /> 35. Interior Noise Levels: Interior noise levels for housing proposed to be located in areas <br /> exposed to an exterior noise level of an Ldn above 60 dB shall be maintained at or below an <br /> Ldn of 45 dB. [Implementation Measure 11.2.1 (4)] <br /> Timing: Compliance verified prior to the issuance of building permits. <br /> 36. Construction Noise: The following measure shall be implemented during construction: <br /> • Construction shall be limited to the hours of 6:00 AM to 9:00 PM on weekdays. Extended <br /> hours which may include Saturdays and Sundays may be allowed through prior notice to <br /> adjacent residents and landowners, and prior approval of the MHCSD for infrastructure <br /> construction and CDD for building permits. <br /> • Comply with all San Joaquin County Development Title for all construction activities <br /> • Equip all construction vehicles or equipment, fixed or mobile,with properly operating and <br /> maintained mufflers and acoustical shields or shrouds, in accordance with the <br /> manufacturers' recommendations. <br /> • Arrange all construction equipment and truck routes to minimize travel adjacent to <br /> occupied residences. <br /> • Locate stationary construction equipment and staging areas as far as possible from <br /> sensitive receptors. Temporary acoustic barriers may be installed around stationary <br /> equipment, if necessary. [Mitigation Measure 4.13-1 from Specific Plan III EIR] <br /> Timing: Inclusion of the above measures as notes on Improvement Plans approved by CDD <br /> and MHCSD prior to Final Map approval. <br /> GEOLOGY AND SOILS <br /> 37. Seismic Safety: The applicant shall comply with the applicable provisions of the MHCSD <br /> Emergency Preparedness Plan. <br /> Timing: Inclusion of a note on Improvement Plans approved by CDD and MHCSD prior to <br /> approval of Final Maps. <br /> 38. Geotechnical Investigation Recommendations: The applicant shall follow the <br /> recommendations of the Preliminary Geotechnical Services Report Mountain House <br /> Business Park Mountain House, California prepared by Kleinfelder, Inc., dated November 6, <br /> 2002. In addition, the following elements or mitigation equivalent shall be followed: [SPIII <br /> Implementation Measure 4.5.3 (e).]: <br /> a) All fill material used for engineered fill at the project site shall meet the specifications <br /> of the Geotechnical Reports. <br /> 7 <br />