My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Project Description <br /> Development Department -- <br /> backfilled to groundwater level and used as an approximately 24-acre agricultural <br /> pond. However,if less mining occurs than planned,more fines than expected are <br /> generated during mining,or a substantial amount of fill is brought to the site as <br /> backhaul from job sites,no pond would be left. Instead,the South Pit would be <br /> backfilled to existing topography and Stage III of the North Pit would be <br /> backfilled to a uniform grade 15 feet above groundwater,consistent with Stages I <br /> and H of the North Pit. <br /> The Applicant would bear all costs of reclaiming the site, as required by the <br /> Surface Mining and Reclamation Act(SMARA). — <br /> Environmental Commitments - <br /> Regulatory requirements enforced by the County and other governmental T <br /> agencies are measures that are required by law and are not considered mitigation <br /> measures. Many of these requirements reduce the potential impacts of a project <br /> to a less-than-significant level. The following measures are specific to the <br /> proposed project and are referred to in subsequent resource discussions where <br /> they serve to avoid or minimize the potential for an impact to occur;as such,they <br /> are not identified as mitigation measures. These regulatory requirements will be <br /> incorporated into the project design and will be included in all construction <br /> documents(e.g.,plans, specifications and estimates). The County will designate <br /> an Environmental Monitor to ensure compliance with the following <br /> environmental commitments. 1 <br /> General Commitments — <br /> ■ A water truck will be used for dust control. <br /> ■ The mobile fuel and lubrication truck will be equipped with automatic shut- <br /> off valves to prevent spills and will carry appropriate absorbent materials to <br /> contain and recover spills. <br /> ■ A Spill Prevention, Control, and Countermeasures Plan will be in place to <br /> guide reporting, control and cleanup activities in the event of a spill. <br /> ■ Onsite drainage will be retained in the settling ponds and reclaimed lake. <br /> Erosion or runoff control measures will be implemented near processing <br /> facilities to prevent offsite sedimentation. <br /> ■ A perimeter berm will be constructed to screen onsite activities from the <br /> views of passers-by on Koster Road and Blewett Road. <br /> ■ Inactive topsoil stockpiles will be sloped at III:I V or flatter and will be <br /> located at least 15 feet from active mining. Erosion control and weed control <br /> measures will be implemented as needed. <br /> ■ Avoidance, setbacks, and relocation of existing utilities at or adjacent to the <br /> project site. Project operations have been designed to avoid the PG&E <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 2_12 <br /> AS os+os os <br />
The URL can be used to link to this page
Your browser does not support the video tag.