My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004098
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
35775
>
2600 - Land Use Program
>
PA-0300550
>
SU0004098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:31 AM
Creation date
9/6/2019 10:43:12 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004098
PE
2605
FACILITY_NAME
PA-0300550
STREET_NUMBER
35775
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
35775 S KOSTER RD
RECEIVED_DATE
3/10/2004 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\APPL.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CDD OK.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\EH COND.PDF \MIGRATIONS\K\KOSTER\35775\PA-0300550\SU0004098\CORRESPOND.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County Community Project Description <br /> Development Department <br /> pipeline and would separate the north pit from the south pit. The existing <br /> water pipeline would be relocated along the property boundaries to avoid the <br /> areas planned for excavation and areas to be excavated would be set back a <br /> minimum of 40 feet from the toe of the Delta Mendota Canal. <br /> ■ The processing site will be fenced with three-strand barbed wire and gated, <br /> and appropriate warning and identification signage will be installed at the <br /> site. <br /> ■ The following County standards contained in Chapter 9.1415, Quarry <br /> Excavation Standards,of the County's Title 9 Development Title, as <br /> summarized here,would be required for approval of the mining permit and <br /> reclamation plan and will be reflected as conditions of approval on the quarry <br /> excavation permit. These standards have been incorporated into the project <br /> design. <br /> ❑ Stockpiling. No stockpiled soil or material shall be placed closer than <br /> twenty-five(25)feet to a property boundary unless it functions for <br /> screening,consistent with Chapter 9-1020. <br /> ` ❑ Private Roads. All private roads shall be maintained so as to control <br /> dust and traffic-control and warning signs shall be installed, if required <br /> by the Director of Public Works. <br /> ❑ Erosion Control. An erosion and sediment control plan shall be <br /> approved by the Development Services Division as part of the <br /> reclamation plan approval. <br /> i ❑ Hours of Operation. Plant operations shall normally be carried out <br /> during the hours from 5:00 a.m. to 9:00 p.m.,with extensions if needed <br /> approved by the Director of the Community Development Department. <br /> ❑ Replacement of Topsoil. Topsoil shall be set aside and replaced and the <br /> site leveled in conformance with the excavation permit. <br /> ❑ Weed Control. If noxious weeds are on site, operations shall be carried <br /> out in accordance to instruction from the Agricultural Commissioner. <br /> ❑ Health Considerations. The project must include provisions for <br /> y mosquito and other pest abatement,and a potable water supply and <br /> approved sanitary facilities for employees. <br /> ❑ Setbacks. No excavation may take place within 25 feet of any property <br /> line or right-of-way. <br /> ❑ Slopes. Temporary interior cut slopes shall comply with state and <br /> ., federal OSHA standards. Final slopes shall not exceed 211:1 V,unless <br /> site-specific geological and engineering analysis demonstrate through a <br /> slope stability analysis that final slopes of I%z H:1 V will meet minimum <br /> stability factors of safety as required in Section 9-1415.2(d)(4). All <br /> slopes over 50 feet high shall be terraced a minimum of 12 feet. <br /> Terraces must be sloped back toward the fill and design such that runoff <br /> is directed to collection points where it can enter catch basins and be <br /> ` conveyed to the toe of slope. A drainage plan shall be submitted to the <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report 2-13 <br /> JSS 05105.05 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.