Laserfiche WebLink
31-10 SR 132 between 1-5/Bird Road Interchanges Weaving <br /> Operations Year 2007 Base Conditions' Levels of Service <br /> (LOS) with Four-Lane Freeway with Proposed SR 132/Bird <br /> Road Interchange (Worst-Case Alternative)......................................3.L-10 <br /> 31-11 SR 132/Bird Road Interchange Ramp Junction Operations <br /> Year 2007 Base Conditions' LOS with Four-Lane Freeway <br /> (Worst-Case Alternative) ...................................................................3.L-11 <br /> 31-12 Year 2007 Base Conditions' Roadway Segment Levels of <br /> Service (LOS) with Proposed SR 132/Bird Road <br /> Interchange........................................................................................31-112 <br /> 31-13 Estimated Roadway Traffic Index (TI)Values Two-Way _ <br /> Traffic.................................................................................................31-114 <br /> 31-14 Estimated Roadway Traffic Index (TI)Values by Direction <br /> ofTravel.............................................................................................3.L-14 <br /> 31-15 Vernalis Area Aggregate Production Sites 2027 Baseline <br /> Average Yearly Production (Tons).....................................................3.L-15 <br /> 31-16 Vernalis Area Aggregate Production Sites Year 2027 <br /> Baseline Conditions Average Daily Truck Trip Generation................31-16 <br /> 31-17 Vernalis Area Aggregate Production Sites Year 2027 <br /> Baseline Conditions Peak Daily Truck Trip Generation.....................31-16 — <br /> 31-18 Vernalis Aggregate Production Sites Year 2027 Baseline <br /> Conditions Hourly Truck Loading Frequencies and _ <br /> Estimated Hourly Truck Generation...................................................3.L-17 <br /> 31-19 Year 2027 Aggregate Truck Trip Distribution ....................................3.L-17 _ <br /> 3.L-20 Year 2027 Baseline Conditions Peak Hour Intersection <br /> Operations with Proposed SR 132/Bird Road Interchange _ <br /> (Worst-Case Alternative) ...................................................................3.L-18 <br /> 31-21 SR 132 between 1-5/Bird Road Interchanges Weaving <br /> Operations Year 2027 Baseline Conditions Levels of <br /> Service (LOS) with Four-Lane Freeway with Proposed SR <br /> 132/Bird Road Interchange (Worst-Case Alternative) .......................3.L-19 <br /> 3.L-22 1-5/SR 132 Interchange Weaving Sections Analysis Year <br /> 2027 Baseline Conditions Levels of Service (LOS)...........................31-19 <br /> 31-23 SR 132/Bird Road Interchange Ramp Junction Operations <br /> Year 2027 Baseline Conditions Levels of Service (LOS) <br /> with Four-Lane Freeway (Worst-Case Alternative)............................3.L-20 _ <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report Viii <br /> J&s 05105 05 <br />