Laserfiche WebLink
r <br /> 31-24 Year 2027 Baseline Conditions Roadway Segment Levels <br /> r of Service (LOS)with Proposed SR 132/Bird Road <br /> Interchange (Worst-Case Alternative) ...............................................3.L-21 <br /> 31-25 Estimated 2027 Roadway Traffic Index (TI)Values by <br /> Direction of Travel..............................................................................3.L-22 <br /> — 3.L-26 DeSilva Gates Quarry Year 2007 Average Daily Truck Trip <br /> Generation......................................................................................-.31-24 <br /> L-24 <br /> 31-27 DeSilva Gates Quarry Year 2007 Peak Daily Truck Trip <br /> Generation.........................................................................................31-25 <br /> 31-28 DeSilva Gates Quarry Truck Trip Distribution from SR <br /> 132/Bird Road Intersection................................................................3.L-25 <br /> 31-29 Year 2007 Plus Project Hourly Truck Loading Frequencies <br /> and Estimated Hourly Truck Generation............................................3.L-26 <br /> 3.L-30 Year 2007 Baseline and Year 2007 Baseline Plus Project <br /> Aggregate Truck Trip Distribution......................................................3.L-26 <br /> 31-31 Year 2007 Baseline and Year 2007 Plus Project Peak <br /> Hour Intersection Operations with Proposed SR 132/Bird <br /> Road Interchange (Worst-Case Alternative)......................................3.L-28 <br /> .- 3.L-32 SR 132 between 1-5/Bird Road Interchanges Weaving <br /> Operations Year 2007 Baseline and Year 2007 Plus <br /> Project Conditions' Levels of Service (LOS) with Four-Lane <br /> Freeway with Proposed SR 132/Bird Road Interchange <br /> (Worst-Case Alternative) ...................................................................3.L-29 <br /> r 3.L-33 SR 132/Bird Road Interchange Ramp Junction Operations <br /> Year 2007 Baseline and Year 2007 Baseline Plus Project <br /> Conditions' LOS with Four-Lane Freeway (Worst-Case <br /> Alternative).........................................................................................31-29 <br /> 3.L-34 Year 2007 Baseline and Year 2007 Baseline Plus Project <br /> Conditions' Roadway Segment LOS with Proposed SR <br /> 132/Bird Road Interchange (Worst-Case Alternative) .......................3.L-30 <br /> 31-35 Roadway Traffic Index (TI)Values Estimated Increase <br /> Resulting from Proposed Project Two-Way Traffic............................3.L-31 <br /> 31-36 Roadway Traffic Index (TI)Values Estimated Increase <br /> ., Resulting from Proposed Project by Direction of Travel....................3.L-31 <br /> 31-37 DeSilva Gates Quarry Year 2027 Average Daily Truck Trip <br /> Generation.........................................................................................3.L-32 <br /> DeSilva Gates Quarry Project <br /> Draft Environmental Impact Report ix <br /> .ras osIos.os <br />