Traffic Impact Study March 24,2004 <br /> Proposed RMC Pacific Mining Site Page 11 <br /> Table 8 <br /> AM Peak Hour Fair Share Calculations— Haul Route 2 <br /> Future Cumulative Equitable <br /> Project With Without <br /> Location Mitigation Share <br /> Traffic Project Project (Percent) <br /> Traffic Traffic <br /> Bird Road and SR 132 Interchange 130 2,870 1,439 9.1 <br /> SR 132 between I-580 and Widen all two-lane 30 2,482 1,189 2.3 <br /> Bird Road segments to four lanes <br /> Widen all two-lane <br /> SR 132 between Bird Road segments to four lanes, <br /> and Interstate 5 upgrade eastbound 115 2,682 1,355 8.7 <br /> structural section — <br /> SR 132 between Interstate Widen all two-lane 115 2,357 1,079 9.0 <br /> 5 and Koster Road segments to four lanes <br /> SR 132 between Koster Widen all two-lane 46 2,239 1,056 3.9 — <br /> Road and McCracken Road segments to four lanes <br /> 8.0—CONCLUSIONS AND RECOMMENDATIONS <br /> Generally-accepted traffic engineering principles and methods were employed to estimate the <br /> amount of traffic expected to be generated by the project and to analyze the traffic conditions — <br /> expected to exist in the future. The conclusion of this traffic impact study is that the existing <br /> road network is adequate or can be mitigated to accommodate the proposed development for <br /> opening year and future conditions. No specific impacts were identified as being caused by the — <br /> project. The conclusions and recommendations for each study intersection and road segment are <br /> presented below. <br /> Intersection of Bird Road and Blewett Road <br /> The intersection of Bird Road and Blewett Road is currently operating at acceptable levels of _ <br /> service and is expected to continue to operate at acceptable levels of service through the year <br /> 2025 with construction of the project. <br /> Intersection of Koster Road and Blewett Road <br /> The intersection of Bird Road and Blewett Road is currently operating at acceptable levels of <br /> service and is expected to continue to operate at acceptable levels of service through the year — <br /> 2025 with construction of the project. The intersection should be widened by expanding the <br /> existing pavement area to accommodate the proposed truck turning movements prior to operation <br /> of the project. — <br /> Intersection of Welty Road and Blewett Road _ <br /> Project traffic is not expected at the intersection of Welty Road and Blewett Road. The <br /> intersection is currently operating at acceptable levels of service and is expected to continue to <br /> operate at acceptable levels of service through the year 2025 with construction of the project. _ <br />