Laserfiche WebLink
HCM Unsignalized Intersection Capacity Analysis Future (2025) With Project Haul Route 3 <br /> 3: SR 132 & Welty Road 5/27/2005 <br /> --I� ~ <br /> Lane Configurations � ►� �►� <br /> } '"x.. <br /> Grade 0% 0% 0% <br /> Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 <br /> CY OF— <br /> Pedestrians _ � 33' a1 <br /> Walking Speed(itis <br /> Right tum flare(veh) <br /> Median storage veh <br /> pX, platoon unblocked <br /> vC1, stage 1 conf vol <br /> vCu, unblocked vol 677 2460 676 <br /> tC, 2 stage s <br /> p0 Lueue free a/o 96 46 94 m: <br /> Volume Left 0 33 0 17 <br /> cSH 1700 915 1700 75 <br /> Queue L=95th (ft) 0 3 0 65 NOW _ <br /> Lane LOS A F <br /> Approach LOS F <br /> Average Delay 2.1 <br /> Analysis Period(min) 15 <br /> 091-a <br /> Synchro 6 Report <br /> Peters Engineering Group Page 3 <br />