Laserfiche WebLink
2. EXECUTIVE SUMMARY <br /> • Alternative 1 —No Project Alternative <br /> • Alternative 2—Reduced Project Production <br /> • Alternative 3—Off-Site Alternative <br /> 2.5 SUMMARY OF ENVIRONMENTAL IMPACTS <br /> Table 2-1 presents a summary of project impacts,and proposed mitigation measures that would r <br /> further avoid or minimize potential impacts. In the table,the level of significance of each <br /> environmental impact is indicated both before and after the application of the recommended <br /> mitigation measure(s). <br /> For detailed discussions of all project impacts and mitigation measures,the reader is referred to <br /> Chapter 4.0, Environmental Analysis. — <br /> RMC Pacific Vemahs Quany Mining and Reclamation Pmject 2-4 FSA/203015 <br /> Adm4ds w Dmfs OR Match 2004 <br />