My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. PROJECT DESCRWnON <br /> r <br /> TABLE 3-2 <br /> PROPOSED PROJECT MINING AND RECLAMATION SCHEDULE <br /> Years to Mine Years to Mine Range of Years Range of Yeats <br /> Mining Operation Product(tons) (1.7 mtns/yr) (4.0 mtns/yr) to Mine to Reclaim <br /> Phase I 4,468,000 3 1 0 to 3 59 to 60 <br /> Phase II 11,006,000 6 3 1 to 9 4 to 12 <br /> Phase III 11,814,000 7 3 4 to 16 8 to 18 <br /> Phase IVa 5,445,900 3 1 7 to 19 58 to 60 <br /> Phase Nb 4,139,000 2 1 8 to 22 58 to 60 <br /> Phase V 16,759,000 10 4 9 to 32 15 to 33 <br /> Phase VI 21,769,000 13 5 13 to 45 18 to 46 <br /> Phase VII 8,605,000 5 2 21 to 56 23 to 57 <br /> Phase IX 5,086,000 3 1 23 to 59 24 to 60 <br /> Total 99,477,900 59 25 25 to 59 <br /> SOURCE: Reclamation Plan,RMC Pacific Materials,Inc.Vernalis Quarry,October 2003 <br /> TOPSOIL AND OVERBURDEN REMOVAL <br /> The total amount of top soil is approximately 800,000 cubic yards, an average of nine inches <br /> thick(i.e., 800,000 cubic yards over 659 acres). Topsoil would be stripped using scrapers and <br /> stockpiled in berms for use in landscape areas and final reclamation. The largest amount of <br /> topsoil stockpiled at one time would be approximately 50,000 cubic yards and will vary as new <br /> areas are opened up and others reclaimed. <br /> The total amount of overburden is approximately 7.4 million cubic yards,an average of seven <br /> feet thick(i.e., 7.4 million cubic yards over 659 acres). The overburden will be stripped by <br /> scrapers and stockpiled in berms, including the landscape berms,prior to use in reclamation. The <br /> berms will be located along the perimeter setbacks. <br /> PIT OPERATIONS <br /> A 71/2 yard excavator will excavate material from the pit and load the pit run material into 40 ton <br /> off-road haul trucks. The haul trucks will transport the pit run material to a feed hopper where <br /> r. the material will be dumped and fed to a series of field conveyors. The field conveyors will <br /> transport the pit run material from the pit bottom to the aggregate plant. The feed hopper and <br /> field conveyors will be moved as new phases are excavated. The series of field conveyors will be <br /> �- extended as the pit becomes farther from the plant. No processing of material is planned in the <br /> pit bottom. <br /> w RMC Pacific Vernalis Quarry Mining and Reclamation Project 3-19 ESA/203015 <br /> Administrative Draft©R March 2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.