My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised Traffic Impact Study March 27,2008 — <br /> Proposed CEMEX Mining Site Page 13 <br /> 6.5—Weaving,Merge, and Diverge Analyses — <br /> Freeway weaving and ramp analyses at the existing I-5/SR 132 interchange were performed using <br /> HCS+ software. The results are presented in Table 7 and the analysis sheets are provided in <br /> Appendix D. The analyses indicate that the interchange is expected to operate at acceptable levels of <br /> service through the year 2025 with the Project based on the projected traffic volumes. The only <br /> exception is that the SR 132 westbound merge from southbound I-5 may operate at a level of service <br /> D in the future with or without the proposed Project. This is not considered a Project-specific <br /> significant impact. <br /> Table 7 — <br /> Weaving,Merge,Diverge Level of Service Summary—Weekday A.M.Peak Hour <br /> Near- Near-Term Cumulative Cumulative <br /> Location Existing Term With Project Without With Project — <br /> WithoutJA <br /> Haul Project Haul Haul <br /> Project Route 3 Route 1 Route 3 <br /> I-5 NB Diverge to EB SR 132 A A A A A A _ <br /> I-5 NB Weave at SR 132 A A A A A A <br /> I-5 NB Merge from WB SR B B B B B B <br /> 132 <br /> I-5 SB Diverge to WB SR 132 A A A A A AI-5 SB Weave at SR 132 A A A A A A <br /> I-5 SB Merge from EB SR B B B B B B B <br /> 132 <br /> SR 132 EB Diverge to SB I-5 A A A A A A A — <br /> SR 132 EB Weave at 1-5 A A A A A A A <br /> SR 132 EB Merge from NB B B B B B B B <br /> I-5 — <br /> SR 132 WB Diverge to NB 1-5 A A B B B C C <br /> SR 132 WB Weave at I-5 A A A A B B B <br /> SR 132 WB Merge from SB C C C C D D D — <br /> I-5 <br /> 6.6—Traffic Index Analyses <br /> The traffic index (TI) is a measure of the number of equivalent single axle loads (ESALs) expected <br /> over the design period, and is described in detail in the Caltrans Highway Design Manual. The <br /> existing ESALs on Blewett and Bird Roads were estimated by performing 24-hour traffic counts and <br /> by a review of the Environmental Impact Reports for Brown Sand and Gravel and Teichert — <br /> Aggregates. The Project traffic is added to the expanded average daily truck traffic to evaluate the <br /> TI with the Project. The worst-case impact is based on an annual production of 4 million tons per <br /> year. A 20-year expansion factor based on an annual growth rate of 3.0 percent was applied to non- <br /> project truck traffic volumes. Table 8 presents a summary of the TI analyses. The supporting <br /> calculations are presented in Appendix E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.