Laserfiche WebLink
Revised Traffic Impact Study March 27,2008 — <br /> Proposed CEMEX Mining Site Page 15 <br /> respectively. This section should be considered as a basic guideline. It is not intended that this <br /> section be utilized independently of the previously-prepared financing documents for improvements <br /> in the region. The equitable share calculations are not considered to be appropriate for use in <br /> determining equitable contributions for structural section upgrades on Bird and Blewett Roads. <br /> Other means of determining equitable contributions should be determined by the County. <br /> Table 9 _ <br /> A.M.Peak Hour Fair Share Calculations—Haul Route 1 <br /> Cumulative Near-TermEquitable <br /> Location Mitigation Traffic Project Project Project Without Share — <br /> Traffic Traffic (Percent) <br /> Bird Road and SR 132 Interchange 306 4,056 2,446 19.0 <br /> SR 132 between 1-580 and Widen all two-lane 30 3,224 2,052 2.6 <br /> Bird Road segments to four lanes <br /> Widen all two-lane <br /> SR 132 between Bird Road segments to four lanes, 138 3,796 2294 92 <br /> and Interstate 5 upgrade structural <br /> section <br /> SR 132 between Interstate 5 Widen all two-lane 23 3,462 2,196 1.8 <br /> and Koster Road segments to four lanes <br /> SR 132 between Koster Widen all two-lane 23 3,119 1,976 2.0 <br /> Road and McCracken Road segments to four lanes <br /> Blewett Road and Bird Road Traffic Signals and 306 1,002 488 59.5 <br /> southbound left-tum lane <br /> Table 10 <br /> A.M.Peak Hour Fair Share Calculations—Haul Route 3 _ <br /> Cumulative Near-TermEquitable <br /> Location Mitigation Traffic Project Project project Without Share <br /> Traffic Traffic (Percent) — <br /> Bird Road and SR 132 Interchange 30 3,780 2,446 2.2 <br /> SR 132 between I-580 and Widen all two-lane 30 3224 2,052 2.6 <br /> Bird Road segments to four lanes — <br /> Widen all two-lane <br /> SR 132 between Bird Road segments to four lanes, 30 2,550 2,294 11.7 <br /> and Interstate 5 upgrade structural <br /> section <br /> SR 132 between Interstate 5 Widen all two-lane 23 3,462 2,196 1.8 <br /> and Koster Road segments to four lanes <br /> SR 132 between Koster Widen all two-lane 23 3,119 1976 2.0 <br /> Road and McCracken Road segments to four lanes <br /> SR 33 11-5 NB Ramp Northbound right-turn 214 1,003 506 43.1 <br /> lane <br /> All-way stop control <br /> SR 33/Vernalis Road with westbound left-tum 260 1,445 760 38.0 <br /> lane <br /> All-way stop with left- <br /> SR 33/Welty Road tum lane on Welty and 306 928 436 62.2 <br /> right-tum lanes on SR 33 <br />