My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I• Revised Traffic Impact Study March 27,2008 <br /> Proposed CEMEX Mining Site Page 16 <br /> 8.0—CONCLUSIONS AND RECOMMENDATIONS <br /> Generally-accepted traffic engineering principles and methods were employed to estimate the <br /> b„ amount of traffic expected to be generated by the Project and to analyze the traffic conditions <br /> expected to exist in the future. The conclusion of this traffic impact study is that the existing road <br /> network can be mitigated to accommodate the proposed development for opening-year and <br /> .. cumulative conditions. The conclusions and recommendations for each study intersection and road <br /> segment are presented below. <br /> Intersection of SR 33 and I-5 Southbound Ramps <br /> The intersection is currently operating at acceptable levels of service and is expected to continue to <br /> operate at acceptable levels of service based on the near-term without-Project conditions. Haul <br /> ` Route 1 is not expected to create opening-day significant impacts. However, Haul Route 3 is <br /> expected to result in an opening-day impact that would require mitigation. <br /> The intersection is expected to operate at a level of service E in the year 2025 even without the <br /> proposed Project. Haul Route I is not expected to create additional significant impacts in the year <br /> 2025. However, Haul Route 3 would exacerbate the cumulative year 2025 impacts to a level of <br /> service F. <br /> V To mitigate the impacts created by Haul Route 3 on opening day the Project may be conditioned to <br /> operate at a maximum annual production of 1.9 million tons while Haul Route 3 is in operation. If <br /> the Project is limited to 1.9 million tons per year, the near-term with Project level of service will be <br /> C and no significant impacts will occur. To mitigate significant impacts in the cumulative <br /> conditions, the Project may be conditioned to eliminate Haul Route 3 after the pending construction <br /> of the Bird Road/SR 132 interchange, at which time only Haul Route 1 would be allowable. <br /> Intersection of SR 33 and I-5 Northbound Ramps <br /> The intersection is currently operating at acceptable levels of service and is expected to continue to <br /> 6' operate at acceptable levels of service based on the near-term without-Project conditions. Haul <br /> Routes 1 and 3 are not expected to create opening-day significant impacts. <br /> ` The intersection is expected to operate at acceptable levels of service in the year 2025 without the <br /> proposed Project. Haul Route 1 is not expected to create additional significant impacts in the year <br /> 2025. However, Haul Route 3 would create an unacceptable cumulative year 2025 level of service. <br /> I <br /> h. To mitigate the cumulative 2025 impacts of Haul Route 3, a northbound right-turn lane would be <br /> required. As an alternative to mitigating cumulative year 2025 conditions, the Project may be <br /> t conditioned to eliminate Haul Route 3 after the pending construction of the Bird Road / SR 132 <br /> 6. interchange,at which time only Haul Route 1 would be allowable. <br /> Intersection of SR 33 and Vernalis Road (Connector to SR 132) <br /> The intersection is currently operating at a level of service D, which is typically considered <br /> unacceptable to Caltrans. The intersection is expected to continue to operate at a level of service D <br /> based on near-term-without-Project conditions. Haul Route 1 is not expected to create new traffic at <br /> the intersection and therefore is not considered to impact the intersection. However, Haul Route 3 is <br /> expected to result in an opening-day significant impact that would require mitigation. A review of <br /> L peak-hour traffic signal warrants suggests that traffic signals are not warranted at the intersection <br /> based on existing and near-term-with-Project conditions. <br /> L <br /> L <br />