Laserfiche WebLink
I• Revised Traffic Impact Study March 27,2008 <br /> Proposed CEMEX Mining Site Page 16 <br /> 8.0—CONCLUSIONS AND RECOMMENDATIONS <br /> Generally-accepted traffic engineering principles and methods were employed to estimate the <br /> b„ amount of traffic expected to be generated by the Project and to analyze the traffic conditions <br /> expected to exist in the future. The conclusion of this traffic impact study is that the existing road <br /> network can be mitigated to accommodate the proposed development for opening-year and <br /> .. cumulative conditions. The conclusions and recommendations for each study intersection and road <br /> segment are presented below. <br /> Intersection of SR 33 and I-5 Southbound Ramps <br /> The intersection is currently operating at acceptable levels of service and is expected to continue to <br /> operate at acceptable levels of service based on the near-term without-Project conditions. Haul <br /> ` Route 1 is not expected to create opening-day significant impacts. However, Haul Route 3 is <br /> expected to result in an opening-day impact that would require mitigation. <br /> The intersection is expected to operate at a level of service E in the year 2025 even without the <br /> proposed Project. Haul Route I is not expected to create additional significant impacts in the year <br /> 2025. However, Haul Route 3 would exacerbate the cumulative year 2025 impacts to a level of <br /> service F. <br /> V To mitigate the impacts created by Haul Route 3 on opening day the Project may be conditioned to <br /> operate at a maximum annual production of 1.9 million tons while Haul Route 3 is in operation. If <br /> the Project is limited to 1.9 million tons per year, the near-term with Project level of service will be <br /> C and no significant impacts will occur. To mitigate significant impacts in the cumulative <br /> conditions, the Project may be conditioned to eliminate Haul Route 3 after the pending construction <br /> of the Bird Road/SR 132 interchange, at which time only Haul Route 1 would be allowable. <br /> Intersection of SR 33 and I-5 Northbound Ramps <br /> The intersection is currently operating at acceptable levels of service and is expected to continue to <br /> 6' operate at acceptable levels of service based on the near-term without-Project conditions. Haul <br /> Routes 1 and 3 are not expected to create opening-day significant impacts. <br /> ` The intersection is expected to operate at acceptable levels of service in the year 2025 without the <br /> proposed Project. Haul Route 1 is not expected to create additional significant impacts in the year <br /> 2025. However, Haul Route 3 would create an unacceptable cumulative year 2025 level of service. <br /> I <br /> h. To mitigate the cumulative 2025 impacts of Haul Route 3, a northbound right-turn lane would be <br /> required. As an alternative to mitigating cumulative year 2025 conditions, the Project may be <br /> t conditioned to eliminate Haul Route 3 after the pending construction of the Bird Road / SR 132 <br /> 6. interchange,at which time only Haul Route 1 would be allowable. <br /> Intersection of SR 33 and Vernalis Road (Connector to SR 132) <br /> The intersection is currently operating at a level of service D, which is typically considered <br /> unacceptable to Caltrans. The intersection is expected to continue to operate at a level of service D <br /> based on near-term-without-Project conditions. Haul Route 1 is not expected to create new traffic at <br /> the intersection and therefore is not considered to impact the intersection. However, Haul Route 3 is <br /> expected to result in an opening-day significant impact that would require mitigation. A review of <br /> L peak-hour traffic signal warrants suggests that traffic signals are not warranted at the intersection <br /> based on existing and near-term-with-Project conditions. <br /> L <br /> L <br />