specific and cumulative impacts were evaluated. Of these eleven major environmental <br /> categories, the Commission concurs with the conclusions in the EIR that the issues and sub- <br /> issues discussed below can be mitigated below a significant impact threshold. For those issues <br /> that cannot be mitigated below a level that is less than significant, overriding considerations exist <br /> which make those impacts acceptable. <br /> In addition to the eleven major environmental categories addressed in the EIR, four other <br /> categories (population and housing; public services; recreation; and utilities and service systems) <br /> were found to have no potential to result in a significant impact. (Draft EIR,pp. 2-2 to 2-3.) The <br /> Commission concurs with the conclusions on these categories and specifically in response to <br /> comments on these issues and finds that no significant impacts have been identified as to those <br /> categories identified and no further analysis is required. <br /> D.1. FINDINGS REGARDING IMPACTS IDENTIFIED IN THE EIR TO BE <br /> LESS THAN SIGNIFICANT AND REQUIRING NO MITIGATION <br /> The following issues were identified during the scoping process as having the potential to cause <br /> significant impact. These issues were found in the EIR as having no potential to cause significant <br /> impact and therefore require no project-specific mitigation. In the following presentation, each <br /> resource issue is identified and the potential for significant adverse environmental effects is <br /> discussed. Where applicable,potential impacts are identified by correlating it with the <br /> environmental category used in the EIR. <br /> D.1.1. Land Use <br /> Impact 4.2.2 <br /> The project is consistent with applicable Land Use designations and policies. This would be a <br /> less-than significant impact. No mitigation is required. (Draft EIR, pp. 4.2-9 to 4.2-11.) <br /> D.1.2. Agricultural Resources <br /> Impact 4.3.1 <br /> Implementation of the Proposed Project would result in the temporary disturbance of Prime <br /> Farmland and Farmland of Statewide Importance, but no agricultural land will be permanently <br /> converted because the lands would be reclaimed to agricultural usage pursuant to the SMARA <br /> standard for prime farmland. This would be a less-than significant impact. No mitigation is <br /> required. (Draft EIR,pp. 4.3-9 to 4.3-10.) <br /> Impact 4.3.2 <br /> The Proposed Project would not conflict with the current agricultural zoning of the subject <br /> properties nor with the provisions of an existing Williamson Act contract, because the County's <br /> General Plan and Ordinances consider quarry operations to be a compatible use under the <br /> Williamson Act so long as the land is reclaimed for agricultural use. This would be a less-than- <br /> significant impact. No mitigation is required. (Draft EIR, p. 4.3-10; see also,Final EIR, pp. 3-32, <br /> 4-1 (project phasing revised to avoid conflicts with Williamson Act lands).) <br /> 5 <br />