My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project-generated traffic could result in accelerated pavement deterioration on study area <br /> roadways. (Final EIR, p. 4-31.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: The traffic index (TI) is a measure of the number of equivalent single axle loads (ESALs) <br /> expected over the design period, and is described in detail in the Caltrans Highway Design <br /> Manual. The existing ESALs on Blewett and Bird Roads were estimated by performing 24-hour <br /> traffic counts and by a review of the environmental impact reports for Brown Sand and Gravel <br /> and Teichert Aggregates. The Final EIR presents a summary of the TI analyses, but because the <br /> traffic impact study prepared for the project is not a design-level document, it is not <br /> recommended that the TI values be used for design purposes. However, the traffic impact study <br /> includes information that provides some estimate of the need for roadway upgrades resulting <br /> directly from project-generated traffic. See Final EIR,pp. 4-31 to 4-33. <br /> Mitigation Measures: <br /> Mitigation Measure 4.4.3: Pavement Upgrades and Replacement. As a condition of approval, <br /> the project applicant or successor-in-interest will be required to enter into an agreement with the <br /> San Joaquin County Department of Public Works regarding the replacement/upgrade and <br /> maintenance of roadways affected by the project. Upgrades and replacements to the Traffic <br /> Index identified in Table 4.4-5 of the EIR will be completed unless the County determines the <br /> need for a different Traffic Index based on future traffic counts. <br /> Blewett Road Between Interstate 5 and Koster Road: The project applicant or successor-in- <br /> interest shall contribute its fair share to future pavement upgrades on this road segment. (Final <br /> EIR, pp. 4-32 to 4-33.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.4.3, impacts associated with pavement deterioration on area roadways are reduced to <br /> a less than significant level. (Final EIR, p. 4-33.) <br /> D.2.4. Noise <br /> Impact 4.5.2 <br /> Operation of the processing plant could potentially increase ambient noise levels at nearby <br /> residence(s). (Draft EIR, p. 4.5-17.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Processing plant noise could result in increased noise levels at nearby residences. See <br /> Draft EIR, pp. 4.5-17 to 4.5-18. <br /> Mitigation Measures: <br /> 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.