Laserfiche WebLink
Mitigation Measure 4.5.2: Implementation of Mitigation Measures 4.5.1 a, 4.5.1b, and 4.5.1c <br /> (construction of a berm and other sound reduction measures)would reduce impacts of processing <br /> plant noise on local residents to a less-than-significant level. (Draft EIR,p. 4.5-19.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.5.2, impacts related to increases in ambient noise levels at nearby residence(s) due to <br /> operation of the processing plant are reduced to a less than significant level. (Draft EIR,p. 4.5- <br /> 19.) <br /> D.2.5. Air Quality <br /> Impact 4.6.1 <br /> Project Construction-Related Emissions Impact. Project construction emissions would result in <br /> intermittent, temporary increases in air pollutant emissions. (Draft EIR,p. 4.6-18.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Construction-related dust (PM10) could affect local visibility and vehicle emissions <br /> (ozone) would contribute incrementally to regional ozone concentrations during the construction <br /> period. See Draft EIR, pp. 4.6-18 to 4.6-21. <br /> Mitigation Measures: <br /> Mitigation Measure 4.6.1: The project applicant shall comply with SJVAPCD's Regulation <br /> VIII control measures, and shall retain an onsite air quality monitor to ensure compliance with <br /> the SJVAPCD's Regulation VIII control measures. The monitor must be familiar with the <br /> SJVAPCD Regulation VIII Fugitive PMIO Prohibitions, including implementation of all feasible <br /> control measures specified in the SJVAPCD's Guide for Assessing Air Quality Impacts. (Draft <br /> EIR,p. 4.6-21.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measure 4.6.1, temporary impacts related to construction emissions are reduced to a less than <br /> significant level. (Draft EIR,p. 4.6-21.) <br /> Impact 4.6.4 <br /> Project Health Risk Impact. Implementation of the project may lead to increases in chronic <br /> exposure at nearby sensitive receptors to certain toxic air contaminants from operation of the <br /> combination of stationary and mobile sources. (Final EIR,p. 4-39.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: If all the equipment identified(i.e., on-site diesel excavators, loaders, and haul trucks) <br /> 16 <br />