had catalyzed particulate filters, with a DPM control efficiency of 85 percent,the maximum <br /> incremental lifetime cancer risks would be 7 and 9 cancers per million(assuming a 70-year <br /> exposure) and between 4 and 8 cancers per million(assuming a 20-year exposure) under the 1.7 <br /> and 4 million production rates. Implementation of this mitigation would reduce project cancer <br /> risk impacts to a less-than significant impact. See Final EIR,pp. 4-39 to 4-45. <br /> Mitigation Measures: <br /> Mitigation Measure 4.6.4a: The applicant shall either utilize new model year on-site <br /> machinery equipped with the best available DPM control technology, or retrofit its fleet of <br /> excavators, on-site haul trucks, and front end loaders with catalyzed DPM filters to minimize <br /> DPM emissions, or, in those limited instances where the retrofit would impede the function or <br /> life of the equipment, or presents safety concerns, the applicant shall comply with alternative <br /> measures developed by the Air Board. (Final EIR, p. 4-44.) <br /> Mitigation Measure 4.6.4b: Implement Mitigation Measure 4.6.1. (Final EIR,p. 4-44.) <br /> Findings: <br /> Based on the whole record, this Commission finds that with implementation of Mitigation <br /> Measures 4.6.4a-b, impacts related to toxic air contaminants are reduced to a less than <br /> significant level. <br /> D.2.6. Geology, Soils, and Seismicitv <br /> Impact 4.7.4 <br /> In the event of a major earthquake, seismic ground shaking could potentially injure people and <br /> cause collapse or structural damage to proposed structures. (Draft EIR,p. 4.7-22.) <br /> Significance Before Mitigation: Potentially Significant. <br /> Facts: Earthquakes are unavoidable and although infrequent, could at some time during the life <br /> of the project, cause worker injury and equipment damage. Structures related to quarry <br /> operations that are required to comply with the CBC seismic design criteria for this area would <br /> likely experience minor damage and remain stable. Other equipment, such as portable offices or <br /> temporary processing equipment could cause injury if substantially damaged during ground <br /> shaking. However, although some structural damage may occur, the overall risk to workers is <br /> considered low because if an earthquake was to occur during working hours,many of the 40 <br /> employees on the site would be operating equipment or be within structures that could withstand <br /> ground shaking. Regardless, the following mitigation measure would further ensure that adverse <br /> impacts associated with earthquake ground shaking be less than significant. See Draft EIR, pp. <br /> 4.7-22 to 4.7-24. <br /> Mitigation Measures: <br /> Mitigation Measure 4.7.4: Earthquake Preparedness and Response Plan. Prior to <br /> commencement of mining, the applicant staff shall complete an Earthquake Preparedness and <br /> 17 <br />