3.6 Proposed Project Components <br /> L <br /> Power Usage <br /> The power grid connection would be at the Koster and Blewett Road intersection. The annual <br /> usage of the aggregate plant is projected to be approximately 14,700 megawatt-hours. The <br /> concrete batch plant is projected to use approximately 415,000 kilowatt-hours, and the asphalt <br /> plant is projected to use approximately 450,000 kilowatt-hours. Natural gas would be used at the <br /> kiln for the asphalt plant at a volume of 500,000 deca-therms per year. <br /> Water <br /> v It is estimated that overall project operations would require approximately 3,840,000 gallons of <br /> water per day (approximately 3,040 acre feet annually)at 1.7 mty. The volume of water required <br /> for dust suppression would he approximately 80,000 gpd during dry months; landscaping would <br /> require approximately 8 acre feet per year for approximately 17 acres of land; and water demand <br /> for the Ready Mix Plant would be approximately 25,000 gpd. <br /> r The Applicant would use well water and recycled water from silt ponds for water supply. Well <br /> water would be used exclusively until silt ponds are established. Once the silt ponds are <br /> established,the Applicant would recycle the decanted waters from the silt pond for use in <br /> L washing the sand and gravel; however it is anticipated that approximately 25 percent of the <br /> project's water requirement would be supplied from the well water. <br /> 6' A temporary silt pond would be built in the Phase IVB area by stripping the overburden from the <br /> Phase I area and creating a basin. The applicant would use well water at the rate of approximately <br /> 3.8 mgd to 8.9 mgd(based on a production range of 1.7 mty to 4.0 mty)until there is enough <br /> ` wastewater to be recycled in the temporary silt pond. Once water recycling begins, the applicant <br /> would only need to replenish the amount of water lost to evaporation and/or sold in the product. <br /> r <br /> Once the silt pond is established, it is anticipated that only 0.28 mgd to 0.4 mgd of water supply <br /> would be supplied by well water. The volume of water needed for replenishment is provided <br /> below. <br /> ` • Evaporation loss: The temporary silt pond in the Phase IVB area would measure <br /> 40 acres. Therefore,evaporation for the year(at 6 feet per year) would be 78.2 <br /> million gallons annually(240 acre-feet), or 214,200 gallons daily. <br /> 6. <br /> • Production loss: Assuming seven percent loss in the product(i.e., products will have <br /> an average of 7 percent moisture when they leave the project site)ata production rate <br /> L of 1.7 million tons per year, product loss would be approximately 210 million pounds <br /> of water annually,or 68,500 gallons of water daily. <br /> • Total loss: By adding the evaporation and product losses the total water loss would <br /> be 282,700 gpd with a production rate of 1.7 million tons per year. With a production <br /> rate of 4.0 million tons per year,the total loss would be 396,800 gallons of water <br /> daily. <br /> �. RMC Pacific Vemalis cuarry Mining and Reclamation Project 3-23 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br /> it <br />