My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.Project Description — <br /> Dust Control — <br /> Sources of potential fugitive dust in the processing operation include: <br /> • Aggregate Plant — <br /> — Conveyor transfer points <br /> — Crushers - <br /> - Screens(dry) <br /> — Load out bunkers <br /> — Material being added to stockpiles via conveyor _ <br /> • Yard <br /> — Internal gravel roads - <br /> - Loading of delivery trucks <br /> • Concrete Batch Plant — <br /> — Conveyor transfer points <br /> — Loading of aggregate bins <br /> — Truck funnel(loading of ready-mix trucks) — <br /> • Asphalt Plant <br /> — Conveyor transfer points <br /> — Loading of aggregate bins <br /> The applicant will be required to obtain Permits to Construct and Permits to Operate from the <br /> SJVAPCD. A water truck will be used to spray all internal yard roads and stockpiles that are <br /> being used to load trucks.A bag house will be used on most crushers,dry screens, transfer points, <br /> and all plants to control airborne dust and emissions. <br /> Hours of Operations <br /> The plant facility's hours of operation for both excavation and processing will be 24 hours per <br /> day,6 days a week(Monday through Saturday) with maintenance on Sundays. — <br /> Portable Plant <br /> While the permanent plant is being constructed,a portable temporary plant would be used for a <br /> period of about two years to process approximately 500,000 tons per year of material. The <br /> portable plant will consist of the same type of equipment as the permanent plant; screens, — <br /> crushers,coarse and fine material washer, etc.The production of this portable plant will typically <br /> be much less than the permanent plant(approximately 300 to 400 tph). The portable temporary <br /> plant will be necessary for developing a silt pond before the permanent plant is in operation. — <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project - ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.