Laserfiche WebLink
4.2 Land Use <br /> r <br /> Impact 4.2.2: The project is consistent with applicable Land Use designations and policies. <br /> This would be a less-than-significant impact. <br /> The following section discusses any inconsistencies between the project and existing adopted <br /> plans, policies, and land use designations. The consistency analysis considers the adopted goals <br /> and policies of the various plans identified in the setting discussion. <br /> San Joaquin County General Plan <br /> The development of mining operations and aggregate processing facilities at the project site is <br /> generally consistent with the current General Plan Designation of General Agriculture(A/G)and <br /> Open Space Resource Conservation(OS/RC). The General Agriculture(A/G)designation <br /> specifically allows mining activities with the appropriate permits. General Plan Agricultural <br /> .. Lands Policy 5 allows non-farm activities within agricultural areas provided that the use is <br /> dependent on a specific location or resource orientation. Non-farm activities must not negatively <br /> impact surrounding agricultural uses,must minimize agricultural disruption, and must incorporate <br /> adequate buffers. <br /> Mining operations are also proposed to occur within areas designated as Open Space Resource <br /> Conservation(OSRC). This designation protects areas with significant resources, including <br /> mineral resources,from premature or incompatible development. Extraction of gravel and sand <br /> deposits,followed by agricultural reclamation is consistent with this designation. However, <br /> 6. pursuant to the requirements associated with development in an OSRC designated-area, a <br /> discretionary use permit will be required as a condition of approval for the project. <br /> L The project is generally consistent with the applicable goals and policies contained within the San <br /> Joaquin County General Plan. Mitigation measures are proposed throughout this FIR to account <br /> r for any new significant nuisances, hazards, or other adverse environmental impacts. In addition, <br /> surface mining operations are not directly adjacent to any existing rural residences. As part of the <br /> project,a minimum setback of 50 feet, including landscape screening, berming, and fencing,will <br /> ` be provided between surface mining operations and adjacent land uses (see Section 3.6.1, <br /> Landscaping and Screening), consistent with the General Plan Agricultural Lands Policy 10.The <br /> 50-foot buffer will help reduce effects, including visual impacts and noise. <br /> f. <br /> Also,consistent with the General Plan Mineral Resources Policy 2,the project applicant will <br /> reclaim mined areas as soon as possible. Finally,consistent with the General Plan Open Space <br /> Policy 3,development of the project area will be for the use of the resource. For a discussion of <br /> General Plan consistency for other environmental resource areas,the reader is directed to the <br /> individual sections within Chapter 4 of this Draft EIR. <br /> San Joaquin County Zoning Code <br /> ` As a condition of project approval, the project will be required to comply with the agricultural <br /> land use and quarry and mining land use regulations specified in the San Joaquin County <br /> Development Title. These regulations establish permit requirements and procedures, and <br /> ` development and quarry excavation standards including requirements for setbacks, stockpiles, <br /> operating conditions, and fencing and landscaping. Compliance with these regulations, including <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.2-9 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />