My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis —" <br /> Interstate 5/SR 132 Interchange — <br /> Freeway weaving and ramp analyses indicate that the interchange is expected to operate at <br /> acceptable level of service through the year 2025 with the implementation of the project based on <br /> the projected traffic volumes. — <br /> Interstate 5/interstate 580 Interchange <br /> Freeway weaving and ramp analyses indicate that the interchange is expected to operate at <br /> acceptable levels of service through the year 2025 with the proposed project based on the <br /> projected future traffic volumes. — <br /> Interstate 580/SR 132 Interchange <br /> Freeway weaving and ramp analyses indicate that the interchange is expected to operate at <br /> acceptable levels of service through the year 2025 with the project,based on the projected traffic <br /> volumes. <br /> Mitigation Measures <br /> Measure 4.4.1a: Although the intersection of Koster and Blewett Roads is anticipated to — <br /> operate at acceptable levels of service with project implementation, the intersection will <br /> require widening to accommodate truck turning movements if access to the mining site is <br /> provided via Koster Road, or if Haul Route Option 2 is allowed. If the County allows the <br /> use of this haul route, the project sponsor would fund its fair share of this measure as a <br /> condition of approval of the project. Peters Engineering Group conducted a Fair-Share <br /> Percentage analysis as part of its Traffic Impact Study for this project. This analysis is <br /> contained in Appendix C. — <br /> Measure 4.4.1b: As a condition of approval, once in production,the applicant will he <br /> required to contribute an equitable share of the cost of the construction of a new <br /> interchange at SR 132 and Bird Road. The fee will consist of an initial contribution and a <br /> per ton—delivered-off-site fee,based on the equitable share of the project's traffic impact <br /> and quantity of delivered material. Caltrans has approved a Project Study Report for an <br /> interchange to replace the existing intersection. The proposed interchange is expected to <br /> mitigate the cumulative impacts to the intersection. <br /> Impact Significance After Mitigation: Less than significant. <br /> Regional Roadway Operations <br /> Impact 4.4.2: The project would increase traffic on regional roadways in the project <br /> vicinity.This would be a potentially significant impact. <br /> A discussion of the project's potential impact to each roadway segment is provided below: <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.4-16 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.