My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis — <br /> • Suspend excavation and grading activity when winds exceed 20 mph. <br /> • Limit area subject to excavation, grading,and other construction activity to less than <br /> four acres at any one time. <br /> The following mitigation measures may be applied to construction sources of combustion: <br /> • Use of alternative fueled or catalyst equipped diesel construction equipment. — <br /> • Minimize idling time. <br /> • Limit the hours of operation of heavy duty equipment and/or the amount of <br /> equipment in use. <br /> • Replace fossil-fueled equipment with electrically driven equivalents (provided they <br /> are not run via a portable generator set). <br /> • Curtail construction during periods of high ambient pollutant concentrations;this <br /> may include ceasing of construction activity during the peak-hour of vehicular traffic <br /> on adjacent roads. <br /> • Implement activity management(rescheduling activities to reduce short-term <br /> impacts). <br /> The construction phase of the project was also analyzed for NOx emissions because it would he a <br /> large-scale project that could have significant NOx emissions.To understand the extent of the <br /> NOx emissions, an estimate was obtained for the number and type of equipment necessary to <br /> remove an average depth of 9 inches of soil from the entire 659 acres(approximately 800,000 <br /> cubic yards).6 The estimate indicated that initial site preparation,defined as"construction' for <br /> this purpose of this analysis,could be accomplished in 74 days with the following equipment: <br /> • Six Caterpillar 623G scrapers (365 horsepower); <br /> • One Caterpillar D7R dozer(240 hp); _ <br /> • One Caterpillar DSR dozer(310 hp); <br /> • One Caterpillar 140G motor grader(150 hp)- halftime; and <br /> • Two water trucks. <br /> The criteria pollutant engine emissions if all the topsoil were removed in one year are shown in <br /> Table 4.6-4. The estimates show that even if all the topsoil were removed in one year the levels of <br /> ozone precursors (ROG and NOx) would be less than significant. This table confirms that the <br /> increase in criteria pollutant emissions from engines would be less than significant even with all <br /> the topsoil grading occurring in one year. Scaling the estimated effort for the entire project back — <br /> to the effort needed for each of the nine phases of the project, topsoil removal for each phase <br /> could probably be completed in less than one month. <br /> 6 Lance A.Bushnell,Chief Estimator,Performance Excavators,San Rafael,California,February 17,2006. <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project 4.6-20 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.