My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004094
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36736
>
2600 - Land Use Program
>
QX-01-0002
>
SU0004094
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:02:10 PM
Creation date
9/6/2019 10:43:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004094
FACILITY_NAME
QX-01-0002
STREET_NUMBER
36736
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36736 S KOSTER RD
RECEIVED_DATE
1/8/2002 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36736\QX-01-02_PA-0200065\SU0004094\EIR 2004.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2073
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.Environmental Analysis <br /> a cement silo,aggregate bins, conveyors,baghouse, bermed admixture tank farm, reclaimer and — <br /> concrete lined washout basins. The asphalt plant, with an estimated production of 400,000 tons <br /> per year, would he owned and operated by others. It would include a batch tower, aggregate bins, <br /> baghouse, and hot oil tanks. — <br /> Approximately 75 percent of the processing plant would involve a wet screening process. The <br /> wet plant would consist of scrubbers,crushers, coarse material washers,fine material washers, — <br /> conveyors, and wet screens for washing and sizing of materials. The other approximately <br /> 25 percent of the material would be processed through a dry circuit. This circuit would consist of <br /> conveyors,crushers, and dry screens for the sizing of the crushed aggregates. <br /> Excavators would be used for the harvesting of the sand and gravel lenses. Haul trucks would be <br /> loaded with sand and gravel material for a short haul from the excavator to a field conveyor line. <br /> Loaders would be used within the plant area for truck loading of some of the sand and gravel <br /> products. The graders and compactors would be used for haul road maintenance and the building _ <br /> of reclamation structures(i.e., land engineered structures to provide reclamation). <br /> The types of equipment to be used in the mining and hauling of the material include the _ <br /> following: <br /> • Excavators a Bobcat loader <br /> • Haul trucks • Maintenance truck — <br /> • Front end loaders • Lube and fuel truck <br /> • Grader and compactors • Forklift <br /> • Dozer • Pickup trucks — <br /> • Scrapers • Water truck <br /> Scrapers would be used to strip and remove topsoil,overburden, and clays.Topsoil would be — <br /> stripped and removed by using scrapers, and stockpiled in the berms for use in landscape areas <br /> and future reclamation. The highest volume of stockpiled topsoil would reach approximately <br /> 50,000 cubic yards. The stockpiles would be watered and track rolled to prevent erosion and — <br /> would be seeded for further protection if necessary. The on-site equipment and material haul <br /> roads would be unpaved. <br /> Although there are operational emissions of PMIo, the Valley Air District guidance does not <br /> provide for a significance threshold for PM1o. However,the project must comply with Regulation <br /> VIII with regards to visible emissions and opacity requirements as well as any Authority-to- <br /> Construct permits. Of the 355 tons per year of PM1g emissions from on-site processing <br /> equipment,63 percent is from the crushers, screening, conveyors, and other operations within the <br /> sand and gravel process, 16 percent is from unpaved roads, with the remainder from the concrete, — <br /> asphalt, and sand dryer equipment. <br /> Tables 4.6-5A through 4.6-5C present the estimated project annual air emissions due to the <br /> project in 2008 and 2020 at production levels of 4 million, 2.85 million, and 1.7 million tons per <br /> year respectively. Total ROG emissions from the quarry operations are significant for production <br /> levels of 4 and 2.85 million tons per year in 2008 and less than significant for the other scenarios. <br /> However, total NO:emissions from the quarry operations are significant under all production <br /> RMC Pacific Vernalis Quarry Mining and Reclamation Project .6-22 ESA/203015 <br /> Draft Environmental Impact Report May 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.