My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004149
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KOSTER
>
36869
>
2600 - Land Use Program
>
QX-96-0001
>
SU0004149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2020 1:00:10 PM
Creation date
9/6/2019 10:44:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004149
FACILITY_NAME
QX-96-0001
STREET_NUMBER
36869
Direction
S
STREET_NAME
KOSTER
STREET_TYPE
RD
City
TRACY
ENTERED_DATE
5/12/2004 12:00:00 AM
SITE_LOCATION
36869 S KOSTER RD
RECEIVED_DATE
9/22/1996 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\K\KOSTER\36869\QX-96-01_EIR 96-3\SU0004149\PUB REC REL APPL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
782
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEC-23-86 MON 16; 18 CALTRA D10` FAX NO. 9948pil P. 02 <br /> A4& Kerry SuMvan <br /> December 23. 1996 <br /> � M <br /> Page 2 <br /> E f - Tmpacts of large trucks on they structural and operational'aspects at the following <br /> Iocations: 1' <br /> 1) Highway 132/Koster Road; <br /> 2) Highway 132/Bird Road, and <br /> 3) High%yay 132/1-5 ramps. i� <br /> - As proposed,the truck route north on Koster Road, left onto Highway 132 is not <br /> acceptable.- If this Fuute is selected at Koster Road, a new bridge should be built <br /> (consistent with the Freeway Agreement) with a right-turn onto the frontage road then <br /> easterly to the Highway 33 interchange providing freeway access. <br /> - Access should be south on Koster Road,cross the California Aqueduct and northwest to <br /> the new interchange at I-5 (identified through an earlier study done by Granite quarry). <br /> From our initial rCview, we believe that the most effective mitigation for the truck traffic <br /> created by this project would be to gain highway access from this new I-5 interchange. <br /> - A discussion of recommended mitigation measures and a reference to funding <br /> responsibility for any improvements made necessary by the project traffic. The <br /> mitigation's established for this project should be integrated with the mitigation and <br /> financial mechanisms established by the County of San Joaquin for all the proposed <br /> quarry projects in this area. <br /> 1 <br /> A Project Study Report (PSR),will be required for any work proposed at the Highway <br /> 132 intersections. This was already done for the 1-5/Bird Road proposed interchange. <br /> iPlease refer to our letter of October 9, 1996, to Tom Gau about this same project. We <br /> E would like to meet with your staff and consultant to scope the traffic study to.be done for <br /> ti this EIR. <br /> Any work done in Sta1c right of way will require an encroachment permit. As the lead <br /> Agency you should review the need for cultural resource, biological resource and hazardous <br /> waste studies in our right of way with!the applicant. Please provide Caltrans with either: 1) <br /> appropriate studies done by qualified professional staff; and 2)the rationale for your CEQA <br /> determination that these issues are not of concern in the State right of way. This will expedite <br /> our review of the encroachment permit. <br /> We appreciate the opportunity to comment on the Notice of Preparation/Initial Study and <br /> look forward to working with you on thispro'ect. If you have any questions regarding our <br /> review, please contact Chris Sayre of my staff at(209) 948-7142. <br /> Sincerely, <br /> DANA COWELL _ <br /> Chief,Transportation <br /> Planning Branch B <br /> cc; Barton Meays/SJCOG <br />+� 6S40 <br /> l K <br /> 1 F <br />
The URL can be used to link to this page
Your browser does not support the video tag.