Laserfiche WebLink
Jnrtiai Study—LID Annexation <br /> d) A substantial temporary or periodic increase in ambient noise E F-1 ❑ <br /> levels in the project vicinity above levels existing without the <br /> project? <br /> e) For a project located within an airport land use plan or, where El ❑ ❑ 0 <br /> such a plan has not been adopted, within two miles of a public <br /> airport or public use airport, would the project expose people <br /> residing or working in the project area to excessive noise levels? <br /> t) For a project within the vicinity of a private airstrip, would the ❑ ❑ ❑ 0 <br /> project expose people residing or working in the project area to <br /> excessive noise levels? <br /> The proposed Project would not create any long term noise impacts from operation of its facilities. It will <br /> however,create short-term construction impacts in areas near sensitive receptors. As a result,adherence <br /> to the City's Noise Ordinance that limits construction activity to certain times of day will be <br /> recommended for approval. <br /> For the provision of sewer and water services, noise impacts were analyzed in the Lathrop Water, <br /> Wastewater and Recycled Water Master Plan EIR (Master Plan EIR), River Islands EIR and for sewer <br /> and recycled water, the Phase I Expansion of Water Recycling Plant No. 1 EIR and LAFCO's LID <br /> Formation Initial Study/MND. All of these documents are incorporated by reference. Any impacts <br /> associated with these services would be mitigated by the mitigation measures identified in these previous <br /> documents and no additional analysis is necessary. Copies of the documents are available in the San <br /> Joaquin County Community Development Department Office. <br /> The proposed project does not involve substantial changes to the Project which will require major <br /> revisions of the prior enviromnental documents due to the involvement of new or substantially more <br /> severe environmental impacts because the LID formation and the LID's provision of services previously <br /> were evaluated in the prior environmental documents. Further, there are no substantial changes with <br /> respect to the circumstances in which the project will be undertaken that would involve new or more <br /> intensive impacts in this issue area. Finally,there is no new information of substantial importance,which <br /> was not known and could not have been known when the prior environmental documents were prepared, <br /> that indicates that the project would have new or more severe aesthetic impacts or that considerably <br /> different or feasible mitigation measures are available that the LID declines to implement. The proposed <br /> project would not require additional mitigation measures to avoid new significant environmental effects. <br /> For these reasons,no further analysis is required. <br /> 2.11.3 Noise—Mitigation Measures <br /> Noise 1: Unless otherwise permitted by the City of Lathrop,all LID construction activity shall be <br /> limited within residential zones,or within 500 feet of a residential zone,between 10 p.m. <br /> and 7 a.m.on Sunday through Thursday and between 1 I p.m. and 9 a.m. on Friday, <br /> Saturday,and legal holidays. <br /> 2.11.4 Noise—References <br /> City of Lathrop(Grunwald and Associates).Comprehensive General Plan&Environmental Impact <br /> Report. As amended through January 28, 2003. SCH#1991022059 <br /> 54 <br />