Laserfiche WebLink
- 2 - <br /> bomb charts confirmed results of test: <br /> Bomb Depth 3903' 3936' <br /> IHP 2145 2172 <br /> ISIP 1675 1670 <br /> IFP 696 693 <br /> FFP 1283 1268 <br /> FHP 2086 2081 <br /> Maximum recorded temperature: 1320F. Run in with drilling assembly. Drilled <br /> 7-7/8" hole to 4075'. Mud: 75#; 43 secs; 7. 2 cc; 2/32"; 10.0 pH; 42 G/G. <br /> 10.0 pH; 42 G/G. <br /> 9/7/70 Drilled 7-7/8" hole to 4984'. Mud: 75#; 43 secs; 7. 2 cc; 2/32"; 1-1/2% sand; <br /> 10. 0 pH; 42 G/G. <br /> TOTCO SURVEY: 4506' 0015' <br /> 9/8/70 Drilled 7-7/8" hole to 5000' total depth. Conditioned mud and ran Schlumberger <br /> IES log. Started laying down drill collars and drillpipe. With open-ended drill- <br /> pipe hung at 1070', mixed 60 sacks class "G" cement treated with 3% calcium <br /> chloride and equalized at 870'. C.I.P. 2.45 a.m. <br /> 9/9/70 After 4 hours located top of firm cement at 940' . Location and hardness of cement <br /> Plug witnessed and approved by D.0.G. Finished laying down drillpipe. Plugged <br /> top 25' of 8-5/8" casing with cement. Cut off casing at base of teller and welded <br /> steel plate on top. Well abandoned 9/9/70. <br />