Laserfiche WebLink
that in no case shall driveways designated as fire department access be less than twenty (20) feet <br /> wide." Driveway and aisle widths must be shown on the Improvement Plan as well as the <br /> circulation patterns for ingress and egress traffic. <br /> Parking <br /> Development Title Table 9-1015.3(a) requires that 2.5 parking spaces must be provided for <br /> each 1,000 square feet of building area. The required number of parking at the site would be 3 <br /> spaces, 1 of which must be handicapped accessible. The applicant is showing three (3) parking <br /> spaces, and therefore, meets this requirement. <br /> The guidelines for parking stall dimensions for automobiles are a minimum of twenty (20) feet <br /> long by nine (9) feet wide (Development Title Section 9-1015.5). The dimensions for automobile <br /> stalls must be shown on the Improvement Plan. <br /> The parking surfacing requirement for off-site wine cellars must be chip seal or an alternative <br /> surfacing material approved by the Director (Development Title Section 9-1075.8[i]). <br /> Wine Storage Capacity <br /> As stated in the marketing plan, the winery proposes a minimum storage capacity of 500 cases. <br /> Pursuant to Development Title Section 9-1075.8(a), the storage capacity for an off-site wine <br /> cellar is a minimum of 300 cases and a maximum of 5,000 cases. The storage area must be <br /> able to contain a minimum of 300 cases. The 450 square foot proposed cellar meets this <br /> requirement. <br /> The Community Development Department has reviewed the Site Approval application and <br /> responses from other agencies. The Community Development Department intends to approve <br /> Site Approval No. PA-0800204 subject to the following conditions: <br /> Site Approval Application No. PA-0800204 was approved by the Community Development <br /> Department on . The effective date of approval is . This approval will expire on ,which is 18 <br /> months from the effective date of approval, unless (1) all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been issued and remain in force, and <br /> (3) all necessary permits from other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be <br /> fulfilled prior to the establishment of the use and the issuance of any building permits. <br /> Those Conditions followed by a Section Number have been identified as ordinance <br /> requirements pertinent to this application. Ordinance requirements cannot be modified, <br /> and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Mo Hatef, 209-468-8477) <br /> a) BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING PERMIT'. <br /> The Site Plan required as a part of the building permit must be prepared by a registered <br /> civil engineer or licensed architect. This Plan must show drainage, driveway access details <br /> including gates, on-site parking, landscaping, signs, existing and proposed utility services, <br /> and grading (refer to the "SITE PLAN CHECK LIST" for details). A fee is required for the <br /> Site Plan review. (Development Title Section 9-884) <br /> 2 <br />