My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0009666
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LONE TREE
>
26414
>
2600 - Land Use Program
>
PA-1300084
>
SU0009666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:34:09 AM
Creation date
9/6/2019 11:02:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0009666
PE
2625
FACILITY_NAME
PA-1300084
STREET_NUMBER
26414
Direction
E
STREET_NAME
LONE TREE
STREET_TYPE
RD
City
ESCALON
Zip
95320-
APN
22908086
ENTERED_DATE
6/17/2013 12:00:00 AM
SITE_LOCATION
26414 E LONE TREE RD
RECEIVED_DATE
6/17/2013 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LONE TREE\26414\PA-1300084\SU0009666\APPL.PDF \MIGRATIONS\L\LONE TREE\26414\PA-1300084\SU0009666\CDD OK.PDF \MIGRATIONS\L\LONE TREE\26414\PA-1300084\SU0009666\EH COND.PDF \MIGRATIONS\L\LONE TREE\26414\PA-1300084\SU0009666\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
revised site plan prior to the Planning Commission meeting. If the applicant is proposing <br /> to keep the structure on the property, proper permits will need to be obtained as part of <br /> the Conditions of Approval. <br /> Change of Occupancy <br /> If any part of the existing mobile home is going to be used as office space for the <br /> proposed operation, a change of occupancy certificate will be required from the State of <br /> California. <br /> The application has been tentatively scheduled for the Planning Commission meeting on <br /> July 18, 2013. The Community Development Department has reviewed the Use Permit <br /> application, and providing any outstanding issues have been resolved, will recommend <br /> that the Planning Commission approve the application subject to the following <br /> Conditions of Approval: <br /> Use Permit Application No. PA-1300084 was approved by the Planning Commission <br /> on . The effective date of approval is . This approval will expire on , which is 18 <br /> months from the effective date of approval, unless (1) all Conditions of Approval <br /> have been complied with, (2) all necessary building permits have been issued and <br /> remain in force, and (3) all necessary permits from other agencies have been issued <br /> and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Contact Staff: Megan Aguirre, (209) <br /> 468-3144) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT'. The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the"SITE PLAN CHECK <br /> LIST' for details). Foundation and soils investigation shall be conducted in <br /> conformance with Chapter 18 of the California Building Code at the time of permit <br /> application. A fee is required for the Site Plan review. (Development Title Section <br /> 9-884) <br /> b. APROVED USE: This application is to convert an existing farm equipment repair <br /> facility into a facility for an agricultural preparation services operation for sorting, <br /> cleaning, and milling of nuts to be constructed in two phases over five years, as <br /> shown on the Site Plan dated May 28, 2013. Phase One, building permit to be <br /> issued within eighteen months from the effective date of approval, includes the <br /> conversion of an existing 8,700 square foot agricultural storage building into an <br /> agricultural preparation and storage building. Phase Two, building permit to be <br /> issued within five years, includes the conversion of an existing 11,300 square foot <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.