My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004714
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
2600 - Land Use Program
>
UP-98-22
>
SU0004714
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2020 1:05:24 PM
Creation date
9/6/2019 11:06:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004714
PE
2627
FACILITY_NAME
UP-98-22
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
APN
19119006
ENTERED_DATE
11/18/2004 12:00:00 AM
SITE_LOCATION
500 E LOUISE AVE
RECEIVED_DATE
1/3/1989 12:00:00 AM
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\APPL.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\CDD OK.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH COND.PDF \MIGRATIONS\L\LOUISE\500\UP-98-22\SU0004714\EH PERM.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
695
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oil filters, level gauges and switches and other <br /> accessories necessary to provide proper lubrication of the <br /> equipment. <br /> 3. Fuel Gas Compression System <br /> Natural gas will be supplied to the site at approximately <br /> 250 psig. Gas compressors will be installed to compress <br /> the fuel gas to 700 psig. A gas filter separator with a <br /> demister to remove liquids from the incoming gas will be <br /> installed. The gas will be metered by the gas supplier <br /> prior to delivery to the gas compressor. <br /> 4. Plant Coolinq Water System <br /> i <br /> I <br /> A plant recirculating cooling water system will provide <br /> cooling water to the various plant systems requiring <br /> cooling. These include the turbine and generator lube oil <br /> systems, the generator coolers, air compressors and fuel <br /> gas compressors. A cooling tower will be provided to cool <br /> and recirculate the water. This cooling tower is treated <br /> with EPA approved chemicals and is located in a remote <br /> section of the plant riot frequented by personnel . <br /> 5. Boiler Feedwater Chemical Treatment 5vstem <br /> Boiler feedwater will be treated with chemicals to remove <br /> residual oxygen and control pH. The chemical feed systems <br /> will consist of mix tanks, feed pumps and chemical piping <br /> to the boiler, drums. These chemicals are approved by the <br /> EPA. <br /> o. Storm Water Runoff <br /> The storm water runoff from the plant will be routed to an <br /> adjacent percolation pond. <br /> f . Electrical Systems, <br /> 1. 115kV Substation <br /> A 115kV high voltage substation containing a 13. 8/115kV <br /> transformer and protective breakers and devices will be <br /> provided in the cogeneration plant to control the delivery <br /> of electrical power- into the PG&E 1154::V system. The power <br /> delivered to PG&E will be metered in the substation. <br /> 2. Arax i l i ar v Power <br /> An auxiliary transformer will be installed to provide 480 <br /> volt service for the electrical systems within the <br /> i <br /> cogeneration plant. <br /> 3. Emergency Power System <br />
The URL can be used to link to this page
Your browser does not support the video tag.