Laserfiche WebLink
Development Committee -2- <br /> UP-94-9 <br /> permits shall been issued and remain in force and (3) all <br /> necessary permits from other acrencies shall be issued and <br /> remain in force prior to January 30 1998 . For phase three, <br /> ( 1) all Conditions of Approval shall be complied with (2) all <br /> necessary building permits shall been issued and remain in <br /> force and (3) all necessary permits from other agencies shall <br /> be issued and remain in force prior to January 30 1999 . <br /> b. Automobile parking spaces shall be provided as follows: <br /> Religious Assembly: . 33/seat X 300 seats = 100 <br /> Administrative offices: 4/1, 000 sq. ft. <br /> X 2 , 590 1 , 500 = -1-G 6 <br /> Community Assembly: . 67/1, 000 X 6, 000 = 4 <br /> Parking for the physically handicapped shall be provided as <br /> specified in Section 9-1015. 10 of the Development Title. <br /> Bicycle parking is required as specified in Section 9-10-15 . 7 <br /> of the Development Title. Parking calculations shall be shown <br /> on the improvement Site Plans. <br /> 106 parking spaces are required for phase one No additional <br /> parking spaces are required for phase two. Four additional <br /> parking spaces are required for phase three. <br /> e. Both access driveways shall be installed in phase one. Access <br /> driveways shall have a width no less than 25 feet. <br /> (Development Title Section 9-1015. 5[h] [1] ) <br /> CM: ss <br /> UP9409RA.CTM <br /> c: Woodbridge Community Church <br /> Mike Smith Engineering <br />