Laserfiche WebLink
.:� <br /> Conditions of Approval _ <br /> SA-92-52 <br /> Page 2 <br /> h. All parking spaces, driveways, and maneuvering areas <br /> shall be surfaced and permanently maintained with base <br /> material sand asphalt concrete, or Portland cement <br /> concrete. - Bumper guards shall be provided when necessary <br /> to protect adjacent structures or properties. Storage <br /> parking areas shall be improved with four (4) inches of <br /> aggregate base material and a chip seal. (Development <br /> Title Section 9-1015.5{e}) <br /> _ <br /> i. Submit an Improvement' Plan prepared by a registered Cavil <br /> • Engineer, showing- drainage, driveway access details, on- <br /> site parking, existing and proposed utility services, and <br /> grading. Storm drainage run-off . shall be terminal <br /> (submit written approval from Regional Water Quality <br /> Control Board for discharge into Duck Creek) . The <br /> drainage pattern and corresponding storm drain <br /> improvements shall. be shown. on the Improvement Plan. <br /> Outlet calculations and details shall be submitted for <br /> approval. -A plan check fee . will. - be required. <br /> (Development Title Section 9-884 .2) <br /> 2 . DEPARTMENT OF PUBLIC WORKS; <br /> a. Dedication to result -in a 30 foot wide right-of-way from <br /> the centerline of Munford Avenue to the property line <br /> shall be` required across the frontage of APN 179-100-14. <br /> (Development Title Section 9--1145.5) <br /> b. Driveway approach on Munford Avenue shall be improved in <br /> accordance with the requirements of the San Joaquin <br /> County Standard R-17 prior to issuance of the building <br /> ' permit. (Development Title Section 9-1145.5) <br /> C. Encroachment permit ,ishall be required for work within <br /> road right--of--way. (Development Title Section 9--1145.2) <br /> d. Maneuvering area shall be provided. No vehicle backing <br /> onto Munford Avenue is allowed. (Development Title <br /> Section 9-1015. 5) <br /> e. The Traffic Impact Mitigation Fee will be required for <br /> this development. The fee is due and payable at the time <br /> of building permit application. .(The fee currently is <br /> $1, 399. 00 per 1, 000 gross square foot of building as <br /> "Warehouse" or $286. 45 per daily trip-end generated in <br />