Laserfiche WebLink
PAGE 3 <br /> SA-92-S2 <br /> D. C. MEMO <br /> details, on-site parking, existing and proposed utility <br /> services, and grading. Storm drainage run-off shall be <br /> terminal (submit written approval from Regional Water <br /> Quality Control Board for discharge into Duck Creek) . The <br /> drainage pattern and corresponding storm drain improvements <br /> shall be shown on the Improvement Plan. Outlet calculations <br /> and details shall be submitted for approval (see handout <br /> entitled "IMPROVEMENT PLAN" for detailed list of all <br /> requirements) . A plan check fee will be required. <br /> (Development Title Section 9-884.2) <br /> CM/cm <br /> c: Michael H. Pyle <br /> t <br /> i <br /> 3 <br />