4. In the event the borehole collapses prior to placement of the concrete grout, Contractor <br /> shall take whatever steps are necessary to reopen the hole and place the seal as specified. <br /> Any such remedial action shall be conducted at the Contractor's expense. <br /> C. Installation of Casing and Screen: <br /> I. Contractor shall install well casing and screen within forty-eight (48) hours of reaching <br /> the total depth of the borehole with hole opener. Casing and screen lengths and locations <br /> will be determined by the Engineer based on results from sampling of the borehole and <br /> geophysical logging. <br /> 2. Contractor shall be responsible for supporting and anchoring the well casing in such a way <br /> as to hold it in tension during the placement of the filter pack and annular seals, during <br /> development, and when the well is completed. The bottom of the casing shall be at <br /> sufficient distance above the bottom of the hole to ensure that none of the weight of the <br /> casing will be supporting from the bottom of the hole. <br /> 3. Contractor shall place PVC casing guides at intervals along the length of the casing to <br /> ensure a minimum separation of 2 inches(2")between the casing and borehole. <br /> 4. A PVC end cap shall be sealed to the bottom of the casing string. <br /> 5. Any casing and/or screen that fails,collapses,separates,or does not allow performance of <br /> pumping test shall be required or replaced, or a new well drilled as approved by the <br /> Engineer,at Contractor's sole expense. <br /> D. Installation of Filter Pack: <br /> I. The filter pack shall be placed in the well bore annulus using a tremie pipe in accordance <br /> with AWWA A100-90,Section 6.7. Filter pack shall be placed in the levels as specified <br /> by the Engineer. The filter pack shall be placed through a feed line or tremie pipe that <br /> extends to the bottom of the casing annulus. The feed line shall be gradually withdrawn <br /> as the filter pack is placed. The rate of filter pack placement shall not exceed 1-1/2 feet <br /> per minute, as measured by a sounding line, and placement shall proceed without <br /> interruption until completion. <br /> 2. After placement of the filter pack around the screen interval. swabbing in the wall shall <br /> occur across the entire length of screen. The diameter of the swab shall be no more than <br /> '/2 inch smaller than the inside dimeter of the casing. As the filter pack material settles. <br /> more shall be added.This operations hall continue until there is no measureable settlement <br /> of the filter pack materials. Should the borehole not take the calculated volume of filter <br /> pack material,with allowances for normal loses and settling,the Engineer will have cause <br /> to reject the well. <br /> E. Installation of Intermediate Bentonite Transition Layer(s)(Annular Seals, /I'Applicahle): <br /> I. The intermediate seals of sand and granular bentonite mixture shall be installed VIN <br /> pumping the mixture through a tremie pipe to the intervals specified by the Engineer. <br /> a. These interval locations and lengths will be provided by the Engineer based on <br /> observations of the borehole. <br /> 2. The seal mix shall not be allowed to freefall more than 20 feet from the bottom of the <br /> tremie pipe to the top of the filter pack material or seal interface established from previous <br /> sounding. Each seal, or portion thereof, shall be placed form the bottom of each interval <br /> to the top, in a continuous operation. <br /> 3. The Contractor will sound the seal to verify the location of the top of the seal after each <br /> mixture has been pumped. (Jpon completion of installation ofeach annular seal.or portion <br /> thereof, no additional work will be performed until the depth to the top of that seal has <br /> been accurately determined by sounding. <br /> GRINDSTONE.TOE'S SUMMARY OF WORK <br /> REPLACEMENT WELL O1 11 00-8 J"nc 2�, 2019 <br />