Laserfiche WebLink
This item is tentatively scheduled to be considered by the San Joaquin County Planning <br /> Commission on January 18, 2000. The Community Development Department has <br /> reviewed the proposed Use Permit and will be recommending that it be approved subject <br /> to the following recommended Conditions of Approval: <br /> Use Permit Application No. UP-00-22 was approved by the Planning Commission on <br /> . The effective date of approval is . This approval will expire on , which is 18 months <br /> from the effective date of approval, unless (1) all Conditions of Approval have been <br /> complied with, (2) all necessary building permits have been issued and remain in <br /> force, and (3) all necessary permits from other agencies have been issued and <br /> remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements <br /> shall be fulfilled prior to the establishment of the use and the issuance of any <br /> building permits. Those Conditions followed by a Section Number have been <br /> identified as ordinance requirements pertinent to this application. Ordinance <br /> requirements cannot be modified, and other ordinance requirements may apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT (Staff Contact: Tina Wehrmeister, 468- <br /> 8477) <br /> a. BUILDING PERMIT: Submit an "APPLICATION-COMMERCIAL BUILDING <br /> PERMIT'. The Site Plan required as a part of the building permit must be prepared <br /> by a registered civil engineer or licensed architect. This Plan must show drainage, <br /> driveway access details including gates, on-site parking, landscaping, signs, <br /> existing and proposed utility services, and grading (refer to the "SITE PLAN CHECK <br /> LIST' for details). A fee is required for the Site Plan review. (Development Title <br /> Section 9-884) <br /> b. APPROVED USE: This approval is for youth soccer complex in two phases as <br /> shown on the Site Plan dated November 21, 2000. (Use Type: Recreation— Parks) <br /> 1) Phase I: One full size soccer field, two portable pre-fabricated bleachers, a <br /> 6,000 sq. ft. multi-use building which will house a changing room, meeting <br /> room, restroom, and snack bar with kitchen, a parking area, and a 600 sq. ft. <br /> maintenance and equipment building. <br /> 2) Phase II: Two full size soccer fields, lighting for phase one field only, <br /> expansion of the parking area. <br /> 3) Use of the meeting room shall be restricted to team activities. <br /> c. COMPLIANCE DATE: Because this development is currently operating without the <br /> required permits, the applicant shall submit and be issued all required building <br /> permits for improvements on the project site within three months of this application's <br /> approval date. <br /> d. STORM DRAINAGE: Stormwater drainage shall be retained on-site. The drainage <br /> pattern and corresponding storm drain improvements shall be shown on the Site <br /> Plan. Drainage calculations prepared by a registered civil engineer or architect <br /> shall be included. (Development Title Section 9-1135) <br />