Laserfiche WebLink
All storm water is contained within the quarry area and used in <br /> the washing of sands to gain clay and silt needed for the pond <br /> liner . This will reduce the amount of ground water required to <br /> supplement washing water . No significant effects to surface <br /> and ground water quality will result from the proposed surface <br /> mining operation . Mining will not disturb any perennial <br /> streams . Ground water will be pumped out through perimeter <br /> wells to an existing drainage easement , which runs under the <br /> Union Pacific Rail Road right-of-way in the southwest portion <br /> of the 162-Acre property boundary . During mining, as the <br /> ground water table lowers locally, water quality will remain <br /> unchanged . The dewatering process will draw water away from the <br /> quarry area and all excavation will occur on the dry bed of the <br /> quarry bottom . After excavation is completed, the bottom and <br /> sides will be lined with a Hypolon (Dupont) CSPE Liner and <br /> reinforced by a 12" clay liner or layer on the slope areas . <br /> 1 . 4 . 4 Biological Resources <br /> As discussed in the Biological Resources section (5 .4) , no <br /> significant resources will be impacted by the project . <br /> Generally speaking, a less than significant impact will occur <br /> because resources affected are insignificant when compared to <br /> the regional resource population and/or the impact will be <br /> temporary and shall be remediated by reclamation to the <br /> proposed subsequent land use or alternatively, in the absence <br /> of an approved use permit for the subsequent land use, to the <br /> original land use of almond orchard . <br /> 1 . 4 . 5 Noise <br /> Noise impacts will be less than significant . There will be <br /> some noise associated with the operation of mining equipment <br /> and haul trucks , but due to the operation ' s proximity to two <br /> major freeway routes and two railroads , the project ' s noise <br /> will be unnoticeable over the existing background levels . That <br /> additional noise will be mitigated by assuring that all <br /> equipment associated with the operation will be equipped with <br /> approved manufacturers ' noise suppression mufflers and similar <br /> devices . <br /> Landmark Lathrop Group, LLC <br /> 5 - February 3, 2000 <br />