Laserfiche WebLink
AUG-23-2000 07 : 13 AM M7 - SMITH ENGINEERING 209 X34 0102 P. 03 <br /> Property, and merging it with this parcel is the ultimate goal, but at this time, the alternate <br /> driving access is the direction we have chosen. <br /> 4. Storm.pra ¢e <br /> The project site is nearly 40 acres, and to avoid removing the existing vineyard it is desired <br /> to r1 t build a storm retention basin. The proposed project will be constructed so as to <br /> retain all storm water on site, (i.e. sheet drain to vineyard). <br /> Sincerely, ,1 <br /> Michael W. Smith <br /> RC.E. No. 44590 <br /> Mike Smith Engineering <br />