Laserfiche WebLink
I. At the man/exit door of the building intended for inside use. <br /> 2. In the bar/patio area near the steel gate to the garden. <br /> 3. All fire extinguishers at this facility shall be serviced annually by a licensed <br /> company_ <br /> 3. CFC, Section 603.4.2 Portable outdoor gas-fired„heating appliances— <br /> 1. The storage or use of portable out-door gas-fired heating appliance are prohibited <br /> inside of any occupancy, canopy, and/or tents. <br /> 2. Portable out-door gas-fired heating appliances shall be located at least 5„feet from <br /> buildings. <br /> 3. 603.4.2.2.3 Tip-over switch — Portable outdoor gas-fired heating appliances shall be <br /> equipped with a tilt or tip-over switch that automatically shuts off the flow of gas if the <br /> appliance is tilted more than 15 degrees from the vertical. <br /> 4. Doors and Exiting: <br /> 1, Keep-all-large double doors of the building opened at all times during events. They <br /> shall be securely opened. <br /> 2. Change the manlexit door, for the building intended for combination use, to swing <br /> in the direction of exit travel (outward). <br /> BUILDING CODE REQUIREIVIENTS2 The Wowing California BuildiFig Code and San joaqu4p <br /> r. <br /> plans before submittal to the R.uilding ln6pegtipn Division• <br /> pia�rru-v crvrcvv rr.�cv�rorr. <br /> posse to the "'c-primaFyeRttGnna (G G R , Title 24). <br /> 3. Provide identification signs fOF the parking spaGe(s) jRGlUdjR9 the "tow away" sign at eaGh <br /> entFanGe er visible frern each spase (G.G.R., Title-24T <br /> /I Trac slope of a�parking spnaGe shall net e*seed-"fie ineh peF feet (G.G R., Tale 24). <br /> z. The�c slope a parking-a crv�a�rc:r � �. <br /> 6 _ Provide one van_parleing_spaGe <br /> . <br /> 11-Inifnrm Plumbing Gede Table <br /> 8. All FeGGmmendation6 of the Subdivision Sails Rashall be the <br /> GenStFUGtien drawings. <br /> 2. DEPARTMENT OF PUBLIC WORKS (Staff Contact: Alex Chetley, [209] 468-3023) <br /> a. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of building permit application for each phase of the project. The fee shall <br /> be automatically adjusted July 1 of each year by the Engineering Construction Cost Index as <br /> published by the Engineering News Record. (Resolution R-00-433) <br /> PA-1100092 (SA, RA) Conditions of Approval 6 <br />