My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0006069
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
11130
>
2600 - Land Use Program
>
PA-0600287
>
SU0006069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:58 PM
Creation date
9/8/2019 12:49:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0006069
PE
2627
FACILITY_NAME
PA-0600287
STREET_NUMBER
11130
Direction
N
STREET_NAME
STATE ROUTE 99
City
LODI
Zip
95240
APN
05926058
ENTERED_DATE
5/31/2006 12:00:00 AM
SITE_LOCATION
11130 N HWY 99
RECEIVED_DATE
5/30/2006 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\APPL.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\CDD OK.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\EH COND.PDF \MIGRATIONS\N\HWY 99\11130\PA-0600287\SU0006069\EH PERM.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> g. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and <br /> payable at the time of each building permit application. The fee currently is$166.00 per daily trip- <br /> end generated in the Lodi area. The fee shall be automatically adjusted July 1 of each year by <br /> the Engineering Construction Cost Index as published by the Engineering News Record. <br /> (Resolution R-00-433) <br /> h. The Regional Transportation Impact Fee shall be required for this development. The fee is due <br /> and payableat the time of each building permit application. The fee currently is$1,430.00 per <br /> 1,000 gross square feet of building. The fee is based on the current schedule. (Resolution R-06- <br /> 38) <br /> i. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee <br /> is due and payable prior to issuance of each building permit. The fee currently is$680.00 per <br /> 1,000 gross square feet of building designated as Service Commercial. The fee shall be <br /> automatically increased on January 1 of each year through the year 2015 at the rate of 4.55 <br /> percent. (Development Title Section 9-818.4 and Resolution R=97-5) <br /> j. Access along the left bank levee to the existing residences is no longer required to access the <br /> property and shall be deeded to San Joaquin County Flood Control and Water Conservation <br /> District prior to issuance of a building permit for Phase 1. <br /> k. A building setback of 10 feet from the toe of the levee shall be designated on the Final Site Plan. <br /> Any work done within 10 feet of the land side toe of the levee or on State or County owned <br /> property shall require a permit from the Central Valley Flood Protection Board., <br /> I. All property lines, easements, and rights-of-way shall be clearly delineated on the site plan. <br /> m. To allow Channel Maintenance to maintain the levee without interfering with the vegetation of the <br /> proposed project, a six-foot-high solid fence or wall shall be erected and maintained by the owner <br /> of the property along the property line/right-of-way line (but no closer than ten feet from the land <br /> side toe of the levee. No gates or other access points are permitted in the fence/wall. <br /> 5: <br /> n. Approval of this Use Permit does not grant actual or implied access to Bear Creek or its levees. <br /> o. A copy of the Final Site Plan shall be submitted prior to the release of building permits. <br /> p. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has <br /> met the requirements of the Waste Plan Format for Development Projects. The Final Site Plan is <br /> required upon submittal of verification. <br /> q. The applicant shall obtain a Storm Water Pollution Prevention Plan permit from the State Water <br /> Resources Control Board prior to the beginning of any construction. <br /> r. After the Lot Line Adjustment has been recorded (see Condition c.), put prior to the issuance of <br /> the building permit for Phase IV, the applicant shall make an Irrevocable Offer to Dedicate Road <br /> to result in a.67-foot-wide right-of-way from the centerline of Eight Mile Road to the adjusted <br /> property's new frontage (Development Title Section 9-1150.5) <br /> NOTE: Any construction activity that results in the disturbance of at least one acre of soil shall <br /> require a State NPDES construction permit. <br /> Conditions of Approval -5- PA-0600287 <br />
The URL can be used to link to this page
Your browser does not support the video tag.