My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0005294
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
19501
>
2600 - Land Use Program
>
PA-0200442
>
SU0005294
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:56 PM
Creation date
9/8/2019 12:54:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0005294
PE
2666
FACILITY_NAME
PA-0200442
STREET_NUMBER
19501
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
APN
01321051
ENTERED_DATE
8/15/2005 12:00:00 AM
SITE_LOCATION
19501 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
FilePath
\MIGRATIONS\N\HWY 99\19501\PA-0200442\SU0005294\CDD OK.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jose'L.Alva Page 2 <br /> May 29, 2002 <br /> '•1 <br /> �1 <br /> r1 <br /> In addition to the ordinance requirement, the EHD cannot support elimination of the soil <br /> suitability study or support removal of the zoning condition that these parcels be <br /> conriected to public services for water supply, sewage disposal and drainage due to <br /> existing problems in this area that include the following: <br /> 1. Sewage disposal for a mini-storage business located in the northeast <br /> quadrant of this I-L/S.10 zone is provided by a package wastewater <br /> treatment facility operated by the Arbor Mobile Home Park (19690 N. <br /> State Route 99). This wastewater treatment facility was recently in <br /> violation of wastewater discharge requirements issued by the Central <br /> Valley Regional Water Quality Control Board due to failing leach lines and <br /> seepage pits with surfacing sewage. <br /> 2. Numerous rainstorms during the past 25 years have caused severe flooding <br /> and drainage problems in the area. On at least one of these occasions, <br /> residents at the Arbor Mobile Home Park had to be evacuated by boat and <br /> 4-wheel drive vehicles. <br /> Consequently, elimination of one of the zoning conditions that could allow use of onsite <br /> septic systems for sewage disposal is contraindicated for this location. The EHD feels <br /> strongly that the current zoning condition for public services for water supply, wastewater <br /> treatment and drainage is necessary and appropriate for this conditional zone to protect <br /> the public and preclude future health and environmental problems. <br /> Should you have any questions concerning the Planning process, you may contact Kerry <br /> Sullivan, Deputy Director of the Community Development Department, at 468-3140. For <br /> Environmental Health Department concerns, please contact Mike Huggins, Supervising <br /> REHS/RDI, at 468-3437. <br /> Sincerely, <br /> Donna Heran, Director <br /> Environmental Health Department <br /> DWAO <br /> c: Lois Sahyoun, Clerk of the Board of Supervisors <br /> Michael McGrew,Assistant County Counsel <br /> Kerry Sullivan,Deputy Director, Community Development Department <br /> FAUsers\DHWO\Word\Jose Alva—Calkins.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.