Laserfiche WebLink
,, II <br /> `A <br /> r <br /> n. <br /> Fi Tib are Concrete bucket Fi ure 4—Finishin the se vent <br /> LLf' <br /> Figure 5—Entering steam room Figure 6—Vacuum demolding <br /> Once the concrete has reached the required strength, it is removed from the mold by a vacuum lifter <br /> (Figure 6). After de-molding,the segment is fitted with a rubber gasket and exits the building <br /> (Figure 7) for storage in the yard(Figure 8). The finished project is shipped to the jobsite via flatbed <br /> trucks (Figure 9). <br />